Hi,
I don't have time for The Sims 2, (new) requests and all for some time. I will do the current requests, but I won't put a guideline on them so I can do them on my own time.
On a lot of places you'll find I take requests. I do, but I'm on a temporary break right now. So remember your requests till I have time to accept them again.
It will be on my Twitter and Facebook when I have some more time to take requests again, but now life is just too busy for that.
Thanks for understanding and your patience.
Greets,
Lien
IMPORTANT INFORMATION
zaterdag 26 november 2011
dinsdag 27 september 2011
Website's move to new server
By using www.sims2idee.tk as main address not many links need to be changed. There are only 5 links which really need attention for moving to the new server.
These are the NEW links:
These are the NEW links:
- OVERVIEW REQUEST: http://bit.ly/rfioYl
- EXPLANATION OF THE OVERVIEW: http://bit.ly/qCwMu1
- FAQ SIMS2: http://bit.ly/rteCb2
- INSIMINATOR: http://bit.ly/p1qHC1
- UPDATES: http://bit.ly/mQptui
Sorry for any inconvinience this servermoving might have caused.
zondag 24 juli 2011
New Tutorial: Your own movies/TV show on Sims TV
First some important things:
1. The movie shouldn't be too long. (It's smaller (in MB) and takes less time to download)
2. YouTube is the best for short fun movies.
3. It should ALWAYS be AVI!
4. ALWAYS 128x128. Otherwise it will not look good on Sims TV.
5. ALWAYS 15 frames/seconde. It may be more, but then the file will be bigger.
6. You may remove or replace the files with extension .movie (default movies)
8. Channels came with Base Game, University, Seasons and Free Time.
Now the tutorial
First you decide which movie you want for which channel. I choose the trailer of the first Harry Potter movie for the channel Horrormovie Werewolf (came with Free Time) which I found on YouTube. I choose a trailer and not the whole movie as the movie should be short.
IMPORTANT: You have to watch the whole movie (trailer in this case) on YouTube first so it's fully loaded.
If you know which movie you want (YouTube or a file on your computer) go to this site:
http://video.online-convert.com/convert-to-avi
This is what you need to fill in:
Bestand kiezen: Choose the file on your computer.
OF enter URL: Give the URL copied from YouTube
Change Size: 128x128 is ideal.
Change frame rate: 15 frames per second as it should be
Cut video: If the movie you chose is too long you can make it smaller by filling out the start- and endminute. The first 00 is hour. The second 00 are minutes and the third 00 are seconds.
Convert file: Check everything and then press Convert file.
Don't change anything else if you don't know what you're doing!
The longer the movie, the longer it will take to download.
Now you get this screen:
After a short while you get this screen:
You can fill out your e-mail and press Submit address.
If you do that, you may shut the window and even shut down your computer. You'll get an e-mail when the file is ready to download.
If you don't want to give your e-mail, you'll have to wait until the window Save As shows so you can save the file.
Where you need to place the file depends on which channel you chose (see overview at the bottom).
These are the possible paths:
Base Game: C:\Program Files\EA GAMES\The Sims 2\Base\TSData\Res\Movies\Broadcast
University: C:\Program Files\EA GAMES\The Sims 2 University\TSData\Res\Movies\Broadcast
Seasons: C:\Program Files\EA GAMES\The Sims 2 Seasons\TSData\Res\Movies\Broadcast
Free Time: C:\Program Files\EA GAMES\The Sims 2 Free Time\TSData\Res\Movies\Broadcast
Base Game: TvChildren
Base Game: TvFood
Base Game: TvSBN
Base Game: TvMusic
Base Game: Commercials
Base Game: TvWorkout
Univeristy: TvSports
EP Seasons: The Weather Forecast
- Winter: TV_Weather_Winter
- Summer: TV_Weather_Summer
- Spring: TV_Weather_Spring
- Autumn: TV_Weather_Fall
Free Time for all movies: Watch movie... Horor...
- TVMovie_Werewolf
-- Harry Potter 1 (trailer)
- TVMovie_BWCat
Action
- TVMovie_Weather
- TVMovie_Fetch
Childrenmovie...
- TVMovie_Fairies
- TV_FamilyFun
Comedy...
- Mime-kat: TVMovie_MimeCat
- Kip: TVMovie_Checkers
Drama...
- TVMovie_PoolTable
- TVMovie_BubbleBath
The principal is the same for having other movies for the different games. You'll just have to save the AVI-file in the folder Games instead of Broadcast.
I haven't tried this!
I'm not responsible for any crashes, explosions or whatever to your game and computer!
Original tutorial written by Lientebollemeis (me) is found here: http://bit.ly/fJb8MB
New project: Project Realistic Ages
This project grew over the past year. The mods were uploaded on MTS 'cause it wasn't possible (or I didn't know how) to upload them on TSR.
Lately it really bugged me it wasn't possible to upload the mods in one thread on MTS (I couldn't do this before as the project grew over the past year and I didn't plan at first to make so many mods for it). All the mods in one thread was really necessary as with all the requests I received too to change the mods.
So now I discovered how to upload mods on TSR. And I did. So the overview is there yey! But now I don't know what to do with the mods on MTS. There's still no overview there. So I might change those threads gradually.
Here's the complete project: http://bit.ly/oMmYKi
Here's all information you need about the project: http://bit.ly/nLy5C9
Any questions? Please, ask! It might help us both and other simmers.
Lately it really bugged me it wasn't possible to upload the mods in one thread on MTS (I couldn't do this before as the project grew over the past year and I didn't plan at first to make so many mods for it). All the mods in one thread was really necessary as with all the requests I received too to change the mods.
So now I discovered how to upload mods on TSR. And I did. So the overview is there yey! But now I don't know what to do with the mods on MTS. There's still no overview there. So I might change those threads gradually.
Here's the complete project: http://bit.ly/oMmYKi
Here's all information you need about the project: http://bit.ly/nLy5C9
Any questions? Please, ask! It might help us both and other simmers.
woensdag 6 oktober 2010
Project Realistic Ages SIMS 3
In addition to the Project Realistic Ages for SIMS 2, I can now present the same (Base Game) age mod for Sims 3. All the ages Short to Epic are the same and as followed:
Attachment: RealisticAges by Tiake - lientebollemeis variant.zip Downloads:
Baby: 3 months = 3 days
Toddlers: 69 Days
Children: 84 Days
Teens: 72 Days
Toddlers: 69 Days
Children: 84 Days
Teens: 72 Days
Young adults: 184 Days
Adults: 368 Days
Total of baby to adult: 780 days/12 = 65 years
Adults: 368 Days
Total of baby to adult: 780 days/12 = 65 years
Elders have no days, but a chance to die tied to the short, epic, ect age span length. It is 40%, 30%, 20%, 10%, 5%. With short being the highest and epic the lowest.
My biggest thanks go to Tiake on MTS as he made this mod and gave me permission to put it on a website.
Additional credits:
Peter L Jones (maker of the package editor), Tiake (for making this and permission to repost to my heart's content)
Attachment: RealisticAges by Tiake - lientebollemeis variant.zip Downloads:
Labels:
Mod,
Project,
Project Realistic Ages 3,
The Sims 3,
Tiake
maandag 23 augustus 2010
MESH necklaces on MTS & TSR
I uploaded some necklaces on TSR. In order for those necklaces to work, you need a MESH.That can be found here.
With a lot of thanks to Dr_Pixel on MTS.
The necklaces Alphabet Black Arial (for females) can be found here: http://www.thesimsresource.com/downloads/1002898
Attachment Female MESH: MESH_DPXLalphaEaringsNecklace080405.zip Downloads:
Attachment Male MESH: MESH_DPXL122705MaleNecklace.zip Downloads:
The necklaces Alphabet Black Arial (for females) can be found here: http://www.thesimsresource.com/downloads/1002898
Attachment Female MESH: MESH_DPXLalphaEaringsNecklace080405.zip Downloads:
donderdag 8 juli 2010
Created by Lientebollemeis: Postcards: 23 Father's Day cards
These are 23 Father's Day cards for your sims to send to anyone they know in the neighbourhood. The receiver will get a small boost to the relationship with the sender when the recipient looks at the card.I know Father's Day is already over in some countries, but it doesn't mean you can't still send them in your game.
You will need the postal system of MogHughson which you can find here. That thread also contains all information about how to use these cards. You can even make your cards yourself with different categories.
I used images from MS Office Word and I found 12 different texts on this site: http://festivals.iloveindia.com/fathers-day/fathers-day-messages.html
Have fun!
Attachment: ScreenshotInGameFathersDay2.jpg Downloads:
Attachment: ScreenshotInGameFathersDay3.jpg Downloads:
Attachment: PostcardsFathersDay-Liente-20100705.zip Downloads:
Abonneren op:
Posts (Atom)
Older creations
-
▼
2013
(108)
-
▼
juni
(10)
- New remake Sims 3 Late Night: Film - Superstar Actor
- New remake Sims 3 Late Night: Film - Distinguished...
- New remake Sims 3 Ambitions: Medical
- New remake Sims 3 Ambitions: Investigator
- New remake Sims 3 Ambitions: Ghosthunter
- New remake Sims 3 Ambitions: Firefighter
- New remake Sims 3 Ambitions: Fashion Stylist
- New remake Sims 3 Ambitions: Education
- New building: Day Dream 3322
- New remake Sims 3 Ambitions: Architecture
-
▼
juni
(10)