As I do take requests, Calmseaflower requested the major Ranger's Apprentice.
University is needed and it has its own GUID (no overwrite).
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 31, 2012
And can be found here: http://bit.ly/GIu0Wu
IMPORTANT INFORMATION
dinsdag 27 maart 2012
zondag 25 maart 2012
New lifespan: As requested by Zaligelover
As I do take requests, zaligelover requested the following lifespan:
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published April 1, 2012
And can be found here:
| Baby | 2 |
| Toddler | 4 |
| Child | 8 |
| Teen | 8 |
| Adult | 35 |
| Elder | 10 |
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published April 1, 2012
And can be found here:
vrijdag 23 maart 2012
New career: Pop Musician (requested)
This creation can be found here:
Requester Cleotopia (TSR)
Career Title Pop Musician
Careerreward Tele-Prompter
Level 1
Title Pop Music Club Member
Description The pop music club is everything you ever wanted to join. Maybe you don't get paid too great, but you're enjoying every moment of doing what you like: Singing.
Wages $200
Days Monday, Tuesday, Thursday, Friday
Workhours 13.00, 18.00
Outfit Everyday outfit
Carpool Hatchback
Level 2
Title Pop Music Club Leader
Description Wonderful! You made a big promotion! The members of the pop music club were impressed by your strong musical talent and they wanted you to be the leader of the club. Now it's your turn to show them what you've got. You're teaching newbies everything about pop music while you are still working on your own skills.
Wages $250
Days Monday, Tuesday, Friday, Saturday
Workhours 17.00, 23.00
Outfit Everyday Outfit
Carpool Hatchback
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 0
Level 3
Title Local Background Singer
Description Something great happened! A local celebrity, visited the Pop Music club and noticed how talented you are with that strong musical voice. Along with three other singers you will be on stage and be the background voice of a great performance. A lot of exercise will help you to be the best background singer of the stage.
Wages $375
Days Friday, Saturday
Workhours 22.00, 02.00
Outfit Leather Jacket
Carpool Sedan
Cooking + 0
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 0
Level 4
Title Second Voice On Stage
Description The music career is the best what ever happened to you! You're on the right track! The local singer can't get enough from your incredible talented voice and wants you to be his second voice! You're making more than than expected, but will have more hours on stage.
Wages $500
Days Wednesday, Thursday, Friday, Saturday, Sunday
Workhours 22.00, 04.00
Outfit Leather Jacket
Carpool Sports Car - Low
Cooking + 0
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 0
Logic + 0
Cleaning + 0
Friends + 0
Level 5
Title Band Background Singer
Description Everything's turning out better and better! You're going to be a true part of a pop band! After being a great second voice of a local singer a big world famous band wanted you to be the background singer. You're making money like a real rock n' roll star. But you have to work on your body skills, because you have to be a great dancer on stage.
Wages $575
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 23.00, 06.00
Outfit Leather Jacket
Carpool Sports Team Bus
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 2
Logic + 0
Cleaning + 0
Friends + 1
Level 6
Title Band Lead Singer
Description Being a background singer was far under your talent. The world wide Pop band wanted you to be the lead singer. Since their last lead singer left the band, you will replace him. Fans need to get used to the new lead singer, so work on your Charisma. You really need to get popular under the millions of fans.
Wages $700
Days Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 20.00, 03.00
Outfit Everyday Outfit
Carpool Sports Car - Mid
Cooking + 0
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 0
Logic + 0
Cleaning + 0
Friends + 0
Level 7
Title Solo Pop Singer
Description After having a great time in the band, it was time for you to start your own music career. The first time standing on your own legs will be tough, you will have long days and get paid the same way you did in the band. But it's worth it, your fans will absolutaly love you.
Wages $700
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 19.00, 03.00
Outfit Everyday Outfit
Carpool Sports Car - Super
Cooking + 0
Mechanical + 0
Body + 2
Charisma + 1
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 1
Level 8
Title Big Pop Icon
Description Every single song you write, every new music video you make, it all doesn't matter, your fans will always love what you do. Your pictures are all in the magazines and the paparazzi is taking pictures wherever you go. Go on with your career and you'll be the new King/Queen of Pop.
Wages $985
Days Thursday, Friday, Saturday, Sunday
Workhours 19.00, 02.00
Outfit Everyday Outfit
Carpool Limo
Cooking + 0
Mechanical + 0
Body + 1
Charisma + 0
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 0
Level 9
Title Legendary Pop Singer
Description You really made it in the business. You can't go anywhere without being spotted. The magazines are full of gossip about you, whatever you do, you're loving it, but the paparazzi is driving you crazy.Producers are begging to record new songs with you. You're making more money than you ever expected to make. Work on your shows and be extraordinary as you can be.
Wages $1100
Days Thursday, Friday, Saturday, Sunday
Workhours 21.00, 04.00
Outfit Everyday Outfit
Carpool Limo
Cooking + 0
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 0
Logic + 0
Cleaning + 0
Friends + 0
Level 10
Title King/Queen Of Pop
Description There's nobody on the earth who doesn't know your name.Fans are crying of happiness when they get a ticket to your show.The paparazzi is following you, and your bodyguards are trying their hardest to get crazy fans out of your garden.You're the most wanted and richest celebrity around. Being a world wide pop icon isn't that easy - but fame is everything you ever dreamt of, and your dream came true.
Wages $4000
Days Thursday, Friday, Saturday
Workhours 19.00, 02.00
Outfit Everyday Outfit
Carpool Helicopter - Executive
Cooking + 0
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 2
Requester Cleotopia (TSR)
Career Title Pop Musician
Careerreward Tele-Prompter
Level 1
Title Pop Music Club Member
Description The pop music club is everything you ever wanted to join. Maybe you don't get paid too great, but you're enjoying every moment of doing what you like: Singing.
Wages $200
Days Monday, Tuesday, Thursday, Friday
Workhours 13.00, 18.00
Outfit Everyday outfit
Carpool Hatchback
Level 2
Title Pop Music Club Leader
Description Wonderful! You made a big promotion! The members of the pop music club were impressed by your strong musical talent and they wanted you to be the leader of the club. Now it's your turn to show them what you've got. You're teaching newbies everything about pop music while you are still working on your own skills.
Wages $250
Days Monday, Tuesday, Friday, Saturday
Workhours 17.00, 23.00
Outfit Everyday Outfit
Carpool Hatchback
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 0
Level 3
Title Local Background Singer
Description Something great happened! A local celebrity, visited the Pop Music club and noticed how talented you are with that strong musical voice. Along with three other singers you will be on stage and be the background voice of a great performance. A lot of exercise will help you to be the best background singer of the stage.
Wages $375
Days Friday, Saturday
Workhours 22.00, 02.00
Outfit Leather Jacket
Carpool Sedan
Cooking + 0
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 0
Level 4
Title Second Voice On Stage
Description The music career is the best what ever happened to you! You're on the right track! The local singer can't get enough from your incredible talented voice and wants you to be his second voice! You're making more than than expected, but will have more hours on stage.
Wages $500
Days Wednesday, Thursday, Friday, Saturday, Sunday
Workhours 22.00, 04.00
Outfit Leather Jacket
Carpool Sports Car - Low
Cooking + 0
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 0
Logic + 0
Cleaning + 0
Friends + 0
Level 5
Title Band Background Singer
Description Everything's turning out better and better! You're going to be a true part of a pop band! After being a great second voice of a local singer a big world famous band wanted you to be the background singer. You're making money like a real rock n' roll star. But you have to work on your body skills, because you have to be a great dancer on stage.
Wages $575
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 23.00, 06.00
Outfit Leather Jacket
Carpool Sports Team Bus
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 2
Logic + 0
Cleaning + 0
Friends + 1
Level 6
Title Band Lead Singer
Description Being a background singer was far under your talent. The world wide Pop band wanted you to be the lead singer. Since their last lead singer left the band, you will replace him. Fans need to get used to the new lead singer, so work on your Charisma. You really need to get popular under the millions of fans.
Wages $700
Days Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 20.00, 03.00
Outfit Everyday Outfit
Carpool Sports Car - Mid
Cooking + 0
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 0
Logic + 0
Cleaning + 0
Friends + 0
Level 7
Title Solo Pop Singer
Description After having a great time in the band, it was time for you to start your own music career. The first time standing on your own legs will be tough, you will have long days and get paid the same way you did in the band. But it's worth it, your fans will absolutaly love you.
Wages $700
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 19.00, 03.00
Outfit Everyday Outfit
Carpool Sports Car - Super
Cooking + 0
Mechanical + 0
Body + 2
Charisma + 1
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 1
Level 8
Title Big Pop Icon
Description Every single song you write, every new music video you make, it all doesn't matter, your fans will always love what you do. Your pictures are all in the magazines and the paparazzi is taking pictures wherever you go. Go on with your career and you'll be the new King/Queen of Pop.
Wages $985
Days Thursday, Friday, Saturday, Sunday
Workhours 19.00, 02.00
Outfit Everyday Outfit
Carpool Limo
Cooking + 0
Mechanical + 0
Body + 1
Charisma + 0
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 0
Level 9
Title Legendary Pop Singer
Description You really made it in the business. You can't go anywhere without being spotted. The magazines are full of gossip about you, whatever you do, you're loving it, but the paparazzi is driving you crazy.Producers are begging to record new songs with you. You're making more money than you ever expected to make. Work on your shows and be extraordinary as you can be.
Wages $1100
Days Thursday, Friday, Saturday, Sunday
Workhours 21.00, 04.00
Outfit Everyday Outfit
Carpool Limo
Cooking + 0
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 0
Logic + 0
Cleaning + 0
Friends + 0
Level 10
Title King/Queen Of Pop
Description There's nobody on the earth who doesn't know your name.Fans are crying of happiness when they get a ticket to your show.The paparazzi is following you, and your bodyguards are trying their hardest to get crazy fans out of your garden.You're the most wanted and richest celebrity around. Being a world wide pop icon isn't that easy - but fame is everything you ever dreamt of, and your dream came true.
Wages $4000
Days Thursday, Friday, Saturday
Workhours 19.00, 02.00
Outfit Everyday Outfit
Carpool Helicopter - Executive
Cooking + 0
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 2
As I do take requests, Cleotopia requested the career Pop Musician.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 26, 2012
This creation can be found here:
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 26, 2012
This creation can be found here:
donderdag 22 maart 2012
New necklace: "Cat" (requested)
This necklace is "Cat" in Japanese (picture as requested by neocat360)
For females: teen to elder
Can be worn with every kind of outfit.
Don't forget to download the mesh on Sims 2 Idea!
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 28, 2012
And can be found here: http://bit.ly/GULv5n
dinsdag 20 maart 2012
New lifespan and Universityspan: As requested by Libertina Grimm
As I do take requests, Libertina Grimm requested the following lifespan:
| Baby | 24 |
| Toddler | 48 |
| Child | 72 |
| Teen | 72 |
| Adult | 516 |
| Elder | 360 |
| University | 145 hours |
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 24, 2012
And can be found here: http://bit.ly/GGDsYl
vrijdag 16 maart 2012
New lifespan: As requested by melaniecox
As I do take requests, melaniecox requested the following lifespan:
| Baby | 12 |
| Toddler | 36 |
| Child | 96 |
| Teen | 72 |
| Adult | 468 |
| Elder | 360 |
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 19, 2012
And can be found here: http://bit.ly/zXxWrE
donderdag 15 maart 2012
New lifespan and petslifespan: As requested by aennehj
As I do take requests, aennehj requested the following lifespan:
| Baby | 12 |
| Toddler | 12 |
| Child | 12 |
| Teen | 12 |
| Adult | 96 |
| Elder | 24 |
| Kitten/puppy | 12 |
| Adult animal | 60 |
| Elder animal | 24 |
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 21, 2012
And can be found here: http://bit.ly/GGbHVS
dinsdag 13 maart 2012
New pet career: Exterminator (requested)
As I do take requests, Grammapat requested the pet career Exterminator.
It's EP compatible and has its own GUID (no overwrite). It needs EP Pets!
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 17, 2012
And can be found here: http://bit.ly/xuU62i
It's EP compatible and has its own GUID (no overwrite). It needs EP Pets!
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 17, 2012
And can be found here: http://bit.ly/xuU62i
This creation can be found here: http://bit.ly/xuU62i
Requester Grammapat MTS
Career Title Exterminator
Level 1
Title cat Fly catcher
Description cat Watching butterflies was fun as a baby, but now that you're all grown up you want something you can sink your teeth into. Someone is actually willing to pay you to catch flies. They carry germs, but no defences against your lightning claws. Your handlers will be impressed if you come when they call, but sometimes you have to sit patiently.
Title dog Fly catcher
Description dog Watching butterflies was fun as a baby, but now that you're all grown up you want something you can sink your teeth into. Someone is actually willing to pay you to catch flies. They carry germs, but no defences against your lightning claws. Your handlers will be impressed if you come when they call, but sometimes you have to sit patiently.
Wages 100
Days Monday, Wednesday, Friday
Workhours 10.00, 16.00
Carpool Taxi
Level 2
Title cat Spider Stalker
Description cat Spiders can be poisonous, but they can't bite you if you bite them first. All those hours playing cat-teaser have given you fast reflexes; you'll need them to catch this new menace. But if your people don't do some serious training, or you don't have sense enough to get enough sleep, you'll never be a serious hunter.
Title dog Spider Stalker
Description dog Spiders can be poisonous, but they can't bite you if you bite them first. All those hours playing dog-teaser have given you fast reflexes; you'll need them to catch this new menace. But if your people don't do some serious training, or you don't have sense enough to get enough sleep, you'll never be a serious hunter.
Wages 210
Days Monday, Wednesday, Friday
Workhours 09.00, 17.00
Carpool Sports Car - Low
Skills Come
Level 3
Title cat Mouse Mauler
Description cat Every kitty loves cute furry mouse toys. But the real thing is fast, hard to find, and has teeth. Long hours of patiently watching a mouse hole, a quick pounce, then proudly giving your captive to the boss will make you worth your pay. If your people care about all the money you could make, they'll spend time keeping you trained and happy. The next level has shorter hours, but if you're not ruthless you'll be spending your spare time (and your raise) at the vets.
Title dog Rabbit Mauler
Description dog Every doggy loves cute furry rabbit toys. But the real thing is fast, hard to find, and has teeth. Long hours of patiently watching a rabbit hole, a quick pounce, then proudly giving your captive to the boss will make you worth your pay. If your people care about all the money you could make, they'll spend time keeping you trained and happy. The next level has shorter hours, but if you're not ruthless you'll be spending your spare time (and your raise) at the vets.
Wages 330
Days Monday, Wednesday, Friday, Saturday
Workhours 09.00, 16.00
Carpool Sports Car - Low
Skills Stay
Level 4
Title cat Ratter
Description cat When the exterminator has bigger problems than roaches, he brings you. There are no cutsy litter boxes on the job sites, and you will need to talk to the boss about your attack plans. Only a tough barn cat, will make it this far. Rats are fast, mean, and smart. They carry diseases, and big sharp teeth. You're old enough now to out-smart a rat, but if you're too old for a real battle, maybe you should take an early retirement and go back to watching butterflies.
Title dog Ratter
Description dog When the exterminator has bigger problems than roaches, he brings you. There are no cutsy litter boxes on the job sites, and you will need to talk to the boss about your attack plans. Only a scrappy little dog will make it this far. Rats are fast, mean, and smart. They carry diseases, and big sharp teeth. You're old enough now to out-smart a rat, but if you're too old for a real battle, maybe you should take an early retirement and go back to watching butterflies.
Wages 670
Days Monday, Wednesday, Friday
Workhours 09.00, 14.00
Carpool Sports Car - Mid
Skills Speak
Requester Grammapat MTS
Career Title Exterminator
Level 1
Title cat Fly catcher
Description cat Watching butterflies was fun as a baby, but now that you're all grown up you want something you can sink your teeth into. Someone is actually willing to pay you to catch flies. They carry germs, but no defences against your lightning claws. Your handlers will be impressed if you come when they call, but sometimes you have to sit patiently.
Title dog Fly catcher
Description dog Watching butterflies was fun as a baby, but now that you're all grown up you want something you can sink your teeth into. Someone is actually willing to pay you to catch flies. They carry germs, but no defences against your lightning claws. Your handlers will be impressed if you come when they call, but sometimes you have to sit patiently.
Wages 100
Days Monday, Wednesday, Friday
Workhours 10.00, 16.00
Carpool Taxi
Level 2
Title cat Spider Stalker
Description cat Spiders can be poisonous, but they can't bite you if you bite them first. All those hours playing cat-teaser have given you fast reflexes; you'll need them to catch this new menace. But if your people don't do some serious training, or you don't have sense enough to get enough sleep, you'll never be a serious hunter.
Title dog Spider Stalker
Description dog Spiders can be poisonous, but they can't bite you if you bite them first. All those hours playing dog-teaser have given you fast reflexes; you'll need them to catch this new menace. But if your people don't do some serious training, or you don't have sense enough to get enough sleep, you'll never be a serious hunter.
Wages 210
Days Monday, Wednesday, Friday
Workhours 09.00, 17.00
Carpool Sports Car - Low
Skills Come
Level 3
Title cat Mouse Mauler
Description cat Every kitty loves cute furry mouse toys. But the real thing is fast, hard to find, and has teeth. Long hours of patiently watching a mouse hole, a quick pounce, then proudly giving your captive to the boss will make you worth your pay. If your people care about all the money you could make, they'll spend time keeping you trained and happy. The next level has shorter hours, but if you're not ruthless you'll be spending your spare time (and your raise) at the vets.
Title dog Rabbit Mauler
Description dog Every doggy loves cute furry rabbit toys. But the real thing is fast, hard to find, and has teeth. Long hours of patiently watching a rabbit hole, a quick pounce, then proudly giving your captive to the boss will make you worth your pay. If your people care about all the money you could make, they'll spend time keeping you trained and happy. The next level has shorter hours, but if you're not ruthless you'll be spending your spare time (and your raise) at the vets.
Wages 330
Days Monday, Wednesday, Friday, Saturday
Workhours 09.00, 16.00
Carpool Sports Car - Low
Skills Stay
Level 4
Title cat Ratter
Description cat When the exterminator has bigger problems than roaches, he brings you. There are no cutsy litter boxes on the job sites, and you will need to talk to the boss about your attack plans. Only a tough barn cat, will make it this far. Rats are fast, mean, and smart. They carry diseases, and big sharp teeth. You're old enough now to out-smart a rat, but if you're too old for a real battle, maybe you should take an early retirement and go back to watching butterflies.
Title dog Ratter
Description dog When the exterminator has bigger problems than roaches, he brings you. There are no cutsy litter boxes on the job sites, and you will need to talk to the boss about your attack plans. Only a scrappy little dog will make it this far. Rats are fast, mean, and smart. They carry diseases, and big sharp teeth. You're old enough now to out-smart a rat, but if you're too old for a real battle, maybe you should take an early retirement and go back to watching butterflies.
Wages 670
Days Monday, Wednesday, Friday
Workhours 09.00, 14.00
Carpool Sports Car - Mid
Skills Speak
vrijdag 9 maart 2012
New teen career: Pop star (requested)
As I do take requests, greenMisa requested the teen career Pop star.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 12, 2012
And can be found here: http://bit.ly/zuWvOh
Updates 2013-02-23
Mona1863 translated this career into German. Thanks!
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 12, 2012
And can be found here: http://bit.ly/zuWvOh
Updates 2013-02-23
Mona1863 translated this career into German. Thanks!
This creation can be found here: http://bit.ly/AAArSq
Requester thesimgirl4
Career Title Disneyland
Level 1
Title Garbage pickup
Description Just starting out a job at the happiest place on earth, $Me is emptying garbage cans, polishing tables, and more cleaning of the like. After all, someone needs to do it.
Wages 50
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 14.00, 21.00
Outfit NPC - Busdriver
Carpool Taxi
Level 2
Title Cashier
Description Ringing up receipts and giving money back is the life of a cashier. $Me is now conversing with the guests, meeting their vigorous demands. To move up, store up those creativity and logic points.
Wages 70
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 14.00, 22.00
Outfit NPC Salesperson
Carpool Taxi
Skills "1 creativity point 1 logic point"
Level 3
Title Jungle Cruise skipper
Description Finally into the world of attractions, $Me will be guiding boats into the esteemed Jungle Cruise. Remember, this job is famous for the skippers' jokes and puns, but there always seems to be that wise-cracker on each boat that thinks they can outjoke you. Keep building those creativity and logic skill points.
Wages 150
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 14.00, 23.00
Outfit Leather jacket
Carpool Taxi
Skills "2 Creativity skill points 2 logic skill points"
Requester thesimgirl4
Career Title Disneyland
Level 1
Title Garbage pickup
Description Just starting out a job at the happiest place on earth, $Me is emptying garbage cans, polishing tables, and more cleaning of the like. After all, someone needs to do it.
Wages 50
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 14.00, 21.00
Outfit NPC - Busdriver
Carpool Taxi
Level 2
Title Cashier
Description Ringing up receipts and giving money back is the life of a cashier. $Me is now conversing with the guests, meeting their vigorous demands. To move up, store up those creativity and logic points.
Wages 70
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 14.00, 22.00
Outfit NPC Salesperson
Carpool Taxi
Skills "1 creativity point 1 logic point"
Level 3
Title Jungle Cruise skipper
Description Finally into the world of attractions, $Me will be guiding boats into the esteemed Jungle Cruise. Remember, this job is famous for the skippers' jokes and puns, but there always seems to be that wise-cracker on each boat that thinks they can outjoke you. Keep building those creativity and logic skill points.
Wages 150
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 14.00, 23.00
Outfit Leather jacket
Carpool Taxi
Skills "2 Creativity skill points 2 logic skill points"
donderdag 8 maart 2012
New teen career: Magic Shop (requested)
As I do take requests, Freakish Academy requested the teen career Magic Shop.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 14, 2012
And can be found here: http://bit.ly/wkjjt9
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 14, 2012
And can be found here: http://bit.ly/wkjjt9
This creation can be found here: http://bit.ly/AAArSq
Requester thesimgirl4
Career Title Disneyland
Level 1
Title Garbage pickup
Description Just starting out a job at the happiest place on earth, $Me is emptying garbage cans, polishing tables, and more cleaning of the like. After all, someone needs to do it.
Wages 50
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 14.00, 21.00
Outfit NPC - Busdriver
Carpool Taxi
Level 2
Title Cashier
Description Ringing up receipts and giving money back is the life of a cashier. $Me is now conversing with the guests, meeting their vigorous demands. To move up, store up those creativity and logic points.
Wages 70
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 14.00, 22.00
Outfit NPC Salesperson
Carpool Taxi
Skills "1 creativity point 1 logic point"
Level 3
Title Jungle Cruise skipper
Description Finally into the world of attractions, $Me will be guiding boats into the esteemed Jungle Cruise. Remember, this job is famous for the skippers' jokes and puns, but there always seems to be that wise-cracker on each boat that thinks they can outjoke you. Keep building those creativity and logic skill points.
Wages 150
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 14.00, 23.00
Outfit Leather jacket
Carpool Taxi
Skills "2 Creativity skill points 2 logic skill points"
Requester thesimgirl4
Career Title Disneyland
Level 1
Title Garbage pickup
Description Just starting out a job at the happiest place on earth, $Me is emptying garbage cans, polishing tables, and more cleaning of the like. After all, someone needs to do it.
Wages 50
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 14.00, 21.00
Outfit NPC - Busdriver
Carpool Taxi
Level 2
Title Cashier
Description Ringing up receipts and giving money back is the life of a cashier. $Me is now conversing with the guests, meeting their vigorous demands. To move up, store up those creativity and logic points.
Wages 70
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 14.00, 22.00
Outfit NPC Salesperson
Carpool Taxi
Skills "1 creativity point 1 logic point"
Level 3
Title Jungle Cruise skipper
Description Finally into the world of attractions, $Me will be guiding boats into the esteemed Jungle Cruise. Remember, this job is famous for the skippers' jokes and puns, but there always seems to be that wise-cracker on each boat that thinks they can outjoke you. Keep building those creativity and logic skill points.
Wages 150
Days Monday, Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 14.00, 23.00
Outfit Leather jacket
Carpool Taxi
Skills "2 Creativity skill points 2 logic skill points"
dinsdag 6 maart 2012
New career: Chinese Musician (requested)
The creation can be found here:
Requester Alicey MTS
Career Title Author
Careerreward Execuputter
Level 1
Title Office runaround
Description Coffee, anyone? No one wants to be around a writer who hasn't had their coffee yet. It's your job to keep the coffee flowing and get a nod or a grunt in return. But don't despair. Remember who takes sweetener and who takes real sugar; who likes their coffee with milk and who likes it without; and you'll be moving on up in no time.
Wages $150
Days Monday, Tuesday, Wednesday, Friday, Saturday
Workhours 09.00, 18.00
Outfit Everyday outfit
Carpool Taxi
Level 2
Title Editor's editor
Description Behind every great novel there is an editor. Behind every editor, there is someone like you. It is up to you to check an editor's work for mistakes. Maybe they ran out of coffee and missed a few erroneous apostrophes. Maybe they just didn't dot the Is or cross the Ts. Keep a beady eye, or your job is on the line!
Wages $225
Days Monday, Tuesday, Friday, Saturday, Sunday
Workhours 08.00, 16.00
Outfit Everyday Outfit
Carpool Taxi
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 2
Logic + 0
Cleaning + 0
Friends + 1
Level 3
Title Thinktank
Description After voicing a few creative ideas of your own to your boss, you've been bumped up to thinktank! You work one-on-one with the authors in the publishing house, inspiring fresh ideas when writer's block strikes. Sound glamorous? Actually, prepare to take a lot of abuse from authors you've offended and receive no credit for your ideas. But hey, you want this!
Wages $350
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 09.00, 17.00
Outfit Everyday Outfit
Carpool Town Car
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 0
Logic + 0
Cleaning + 0
Friends + 1
Level 4
Title Ghostwriter
Description Having connections is always useful, and at last, you get to start writing novels! Too bad you won't get any credit for them. The hours are long; the work is hard; the authors are ungrateful and you feel like tearing your hair out. And to think, you thought this would be easy...
Wages $420
Days Monday, Wednesday, Thursday, Saturday, Sunday
Workhours 06.00, 14.00
Outfit Leather Jacket
Carpool Town Car
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 1
Level 5
Title One-time author
Description A mistake at the printing press leads to one of your novels being published in your name, not the author you've been ghost writing for! Its sales are average, but you can live with that. A big bump in your pay check and your name on the shelves at last more than makes up for that. Who knows, maybe sales will even pick up.
Wages $660
Days Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 10.00, 18.00
Outfit Leather Jacket
Carpool Sedan
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 0
Level 6
Title Second-time author
Description Sales may have been average for your first novel, but your second is selling well. You have your own editor now and he's already demanding a sequel. Last week you received your first fan mail. Your reviews are good and your name is becoming more widely known. Make friends in the right places and you may find more work on your hands.
Wages $780
Days Tuesday, Wednesday, Thursday, Saturday, Sunday
Workhours 14.00, 21.00
Outfit Leather Jacket
Carpool Sedan
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 0
Logic + 1
Cleaning + 0
Friends + 2
Level 7
Title Series writer
Description Isn't it a great feeling to create well-loved characters? With multiple novels under your belt, you are now almost a household name. Your perfectly-crafted characters are either a blessing or a curse, because now you're expected to write sequel after sequel. Keep at it, and expect to sign a few autographs here and there.
Wages $925
Days Monday, Tuesday, Wednesday, Friday
Workhours 10.00, 17.00
Outfit Cheap Suit
Carpool Sports Car - Low
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 0
Logic + 2
Cleaning + 0
Friends + 2
Level 8
Title Sellout
Description Some might say you sold out, man. You would say they're jealous, and you'd be right. With royalties pouring in from your works and fan-fictions based on your characters appearing all over the internet, it's safe to say that you're number one. Technically your books are still ranking number two to three on the bestseller list... ...but everyone knows, you're number one.
Wages $1080
Days Monday, Wednesday, Friday, Sunday
Workhours 12.00, 17.00
Outfit Slick Suit
Carpool Sports Car - Mid
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 2
Logic + 2
Cleaning + 0
Friends + 1
Level 9
Title Best-selling author
Description You finally break free from that series they made you stick with, The result? Crowds form outside bookstores when your latest work hits the shelves. You are recognised on the street. Kids study your works at school, and enjoy it. All of your novels are being made into blockbusters. Keep up the good work, and there may been even more rewards coming your way...
Wages $1125
Days Monday, Wednesday, Friday
Workhours 12.00, 16.00
Outfit Slick Suit
Carpool Sports Car - Super
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 2
Creativity + 2
Logic + 1
Cleaning + 0
Friends + 1
Level 10
Title Nobel-prize-winning author
Description The Nobel Prize for literature... Awarded to only those who have made outstanding contributions to the literary field, and now your name is on that list. You've really made it now. Your name and your work will live on for centuries. You mostly work from home now, writing as much or as little as you want to gain extra income. It doesn't get any better than this!
Wages $2675
Days Monday
Workhours 13.00, 16.00
Outfit Power Suit
Carpool Limo
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 2
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 1
Requester Alicey MTS
Career Title Author
Careerreward Execuputter
Level 1
Title Office runaround
Description Coffee, anyone? No one wants to be around a writer who hasn't had their coffee yet. It's your job to keep the coffee flowing and get a nod or a grunt in return. But don't despair. Remember who takes sweetener and who takes real sugar; who likes their coffee with milk and who likes it without; and you'll be moving on up in no time.
Wages $150
Days Monday, Tuesday, Wednesday, Friday, Saturday
Workhours 09.00, 18.00
Outfit Everyday outfit
Carpool Taxi
Level 2
Title Editor's editor
Description Behind every great novel there is an editor. Behind every editor, there is someone like you. It is up to you to check an editor's work for mistakes. Maybe they ran out of coffee and missed a few erroneous apostrophes. Maybe they just didn't dot the Is or cross the Ts. Keep a beady eye, or your job is on the line!
Wages $225
Days Monday, Tuesday, Friday, Saturday, Sunday
Workhours 08.00, 16.00
Outfit Everyday Outfit
Carpool Taxi
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 2
Logic + 0
Cleaning + 0
Friends + 1
Level 3
Title Thinktank
Description After voicing a few creative ideas of your own to your boss, you've been bumped up to thinktank! You work one-on-one with the authors in the publishing house, inspiring fresh ideas when writer's block strikes. Sound glamorous? Actually, prepare to take a lot of abuse from authors you've offended and receive no credit for your ideas. But hey, you want this!
Wages $350
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 09.00, 17.00
Outfit Everyday Outfit
Carpool Town Car
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 0
Logic + 0
Cleaning + 0
Friends + 1
Level 4
Title Ghostwriter
Description Having connections is always useful, and at last, you get to start writing novels! Too bad you won't get any credit for them. The hours are long; the work is hard; the authors are ungrateful and you feel like tearing your hair out. And to think, you thought this would be easy...
Wages $420
Days Monday, Wednesday, Thursday, Saturday, Sunday
Workhours 06.00, 14.00
Outfit Leather Jacket
Carpool Town Car
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 1
Level 5
Title One-time author
Description A mistake at the printing press leads to one of your novels being published in your name, not the author you've been ghost writing for! Its sales are average, but you can live with that. A big bump in your pay check and your name on the shelves at last more than makes up for that. Who knows, maybe sales will even pick up.
Wages $660
Days Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 10.00, 18.00
Outfit Leather Jacket
Carpool Sedan
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 0
Level 6
Title Second-time author
Description Sales may have been average for your first novel, but your second is selling well. You have your own editor now and he's already demanding a sequel. Last week you received your first fan mail. Your reviews are good and your name is becoming more widely known. Make friends in the right places and you may find more work on your hands.
Wages $780
Days Tuesday, Wednesday, Thursday, Saturday, Sunday
Workhours 14.00, 21.00
Outfit Leather Jacket
Carpool Sedan
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 0
Logic + 1
Cleaning + 0
Friends + 2
Level 7
Title Series writer
Description Isn't it a great feeling to create well-loved characters? With multiple novels under your belt, you are now almost a household name. Your perfectly-crafted characters are either a blessing or a curse, because now you're expected to write sequel after sequel. Keep at it, and expect to sign a few autographs here and there.
Wages $925
Days Monday, Tuesday, Wednesday, Friday
Workhours 10.00, 17.00
Outfit Cheap Suit
Carpool Sports Car - Low
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 0
Logic + 2
Cleaning + 0
Friends + 2
Level 8
Title Sellout
Description Some might say you sold out, man. You would say they're jealous, and you'd be right. With royalties pouring in from your works and fan-fictions based on your characters appearing all over the internet, it's safe to say that you're number one. Technically your books are still ranking number two to three on the bestseller list... ...but everyone knows, you're number one.
Wages $1080
Days Monday, Wednesday, Friday, Sunday
Workhours 12.00, 17.00
Outfit Slick Suit
Carpool Sports Car - Mid
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 2
Logic + 2
Cleaning + 0
Friends + 1
Level 9
Title Best-selling author
Description You finally break free from that series they made you stick with, The result? Crowds form outside bookstores when your latest work hits the shelves. You are recognised on the street. Kids study your works at school, and enjoy it. All of your novels are being made into blockbusters. Keep up the good work, and there may been even more rewards coming your way...
Wages $1125
Days Monday, Wednesday, Friday
Workhours 12.00, 16.00
Outfit Slick Suit
Carpool Sports Car - Super
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 2
Creativity + 2
Logic + 1
Cleaning + 0
Friends + 1
Level 10
Title Nobel-prize-winning author
Description The Nobel Prize for literature... Awarded to only those who have made outstanding contributions to the literary field, and now your name is on that list. You've really made it now. Your name and your work will live on for centuries. You mostly work from home now, writing as much or as little as you want to gain extra income. It doesn't get any better than this!
Wages $2675
Days Monday
Workhours 13.00, 16.00
Outfit Power Suit
Carpool Limo
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 2
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 1
As I do take requests, loveluan requested the career Chinese Musician.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 10, 2012
And can be found here: http://bit.ly/wAgKnM
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 10, 2012
And can be found here: http://bit.ly/wAgKnM
Labels:
Adult career,
career,
Chinese Musician,
The Sims 2
vrijdag 2 maart 2012
New career: Commercial Art (requested)
As I do take requests, ElionKing requested the career Commercial Art.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 5, 2012
And can be found here: http://bit.ly/xPNcGV
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 5, 2012
And can be found here: http://bit.ly/xPNcGV
Requester Alicey MTS
Career Title Author
Careerreward Execuputter
Level 1
Title Office runaround
Description Coffee, anyone? No one wants to be around a writer who hasn't had their coffee yet. It's your job to keep the coffee flowing and get a nod or a grunt in return. But don't despair. Remember who takes sweetener and who takes real sugar; who likes their coffee with milk and who likes it without; and you'll be moving on up in no time.
Wages $150
Days Monday, Tuesday, Wednesday, Friday, Saturday
Workhours 09.00, 18.00
Outfit Everyday outfit
Carpool Taxi
Level 2
Title Editor's editor
Description Behind every great novel there is an editor. Behind every editor, there is someone like you. It is up to you to check an editor's work for mistakes. Maybe they ran out of coffee and missed a few erroneous apostrophes. Maybe they just didn't dot the Is or cross the Ts. Keep a beady eye, or your job is on the line!
Wages $225
Days Monday, Tuesday, Friday, Saturday, Sunday
Workhours 08.00, 16.00
Outfit Everyday Outfit
Carpool Taxi
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 2
Logic + 0
Cleaning + 0
Friends + 1
Level 3
Title Thinktank
Description After voicing a few creative ideas of your own to your boss, you've been bumped up to thinktank! You work one-on-one with the authors in the publishing house, inspiring fresh ideas when writer's block strikes. Sound glamorous? Actually, prepare to take a lot of abuse from authors you've offended and receive no credit for your ideas. But hey, you want this!
Wages $350
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 09.00, 17.00
Outfit Everyday Outfit
Carpool Town Car
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 0
Logic + 0
Cleaning + 0
Friends + 1
Level 4
Title Ghostwriter
Description Having connections is always useful, and at last, you get to start writing novels! Too bad you won't get any credit for them. The hours are long; the work is hard; the authors are ungrateful and you feel like tearing your hair out. And to think, you thought this would be easy...
Wages $420
Days Monday, Wednesday, Thursday, Saturday, Sunday
Workhours 06.00, 14.00
Outfit Leather Jacket
Carpool Town Car
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 1
Level 5
Title One-time author
Description A mistake at the printing press leads to one of your novels being published in your name, not the author you've been ghost writing for! Its sales are average, but you can live with that. A big bump in your pay check and your name on the shelves at last more than makes up for that. Who knows, maybe sales will even pick up.
Wages $660
Days Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 10.00, 18.00
Outfit Leather Jacket
Carpool Sedan
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 0
Level 6
Title Second-time author
Description Sales may have been average for your first novel, but your second is selling well. You have your own editor now and he's already demanding a sequel. Last week you received your first fan mail. Your reviews are good and your name is becoming more widely known. Make friends in the right places and you may find more work on your hands.
Wages $780
Days Tuesday, Wednesday, Thursday, Saturday, Sunday
Workhours 14.00, 21.00
Outfit Leather Jacket
Carpool Sedan
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 0
Logic + 1
Cleaning + 0
Friends + 2
Level 7
Title Series writer
Description Isn't it a great feeling to create well-loved characters? With multiple novels under your belt, you are now almost a household name. Your perfectly-crafted characters are either a blessing or a curse, because now you're expected to write sequel after sequel. Keep at it, and expect to sign a few autographs here and there.
Wages $925
Days Monday, Tuesday, Wednesday, Friday
Workhours 10.00, 17.00
Outfit Cheap Suit
Carpool Sports Car - Low
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 0
Logic + 2
Cleaning + 0
Friends + 2
Level 8
Title Sellout
Description Some might say you sold out, man. You would say they're jealous, and you'd be right. With royalties pouring in from your works and fan-fictions based on your characters appearing all over the internet, it's safe to say that you're number one. Technically your books are still ranking number two to three on the bestseller list... ...but everyone knows, you're number one.
Wages $1080
Days Monday, Wednesday, Friday, Sunday
Workhours 12.00, 17.00
Outfit Slick Suit
Carpool Sports Car - Mid
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 2
Logic + 2
Cleaning + 0
Friends + 1
Level 9
Title Best-selling author
Description You finally break free from that series they made you stick with, The result? Crowds form outside bookstores when your latest work hits the shelves. You are recognised on the street. Kids study your works at school, and enjoy it. All of your novels are being made into blockbusters. Keep up the good work, and there may been even more rewards coming your way...
Wages $1125
Days Monday, Wednesday, Friday
Workhours 12.00, 16.00
Outfit Slick Suit
Carpool Sports Car - Super
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 2
Creativity + 2
Logic + 1
Cleaning + 0
Friends + 1
Level 10
Title Nobel-prize-winning author
Description The Nobel Prize for literature... Awarded to only those who have made outstanding contributions to the literary field, and now your name is on that list. You've really made it now. Your name and your work will live on for centuries. You mostly work from home now, writing as much or as little as you want to gain extra income. It doesn't get any better than this!
Wages $2675
Days Monday
Workhours 13.00, 16.00
Outfit Power Suit
Carpool Limo
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 2
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 1
Career Title Author
Careerreward Execuputter
Level 1
Title Office runaround
Description Coffee, anyone? No one wants to be around a writer who hasn't had their coffee yet. It's your job to keep the coffee flowing and get a nod or a grunt in return. But don't despair. Remember who takes sweetener and who takes real sugar; who likes their coffee with milk and who likes it without; and you'll be moving on up in no time.
Wages $150
Days Monday, Tuesday, Wednesday, Friday, Saturday
Workhours 09.00, 18.00
Outfit Everyday outfit
Carpool Taxi
Level 2
Title Editor's editor
Description Behind every great novel there is an editor. Behind every editor, there is someone like you. It is up to you to check an editor's work for mistakes. Maybe they ran out of coffee and missed a few erroneous apostrophes. Maybe they just didn't dot the Is or cross the Ts. Keep a beady eye, or your job is on the line!
Wages $225
Days Monday, Tuesday, Friday, Saturday, Sunday
Workhours 08.00, 16.00
Outfit Everyday Outfit
Carpool Taxi
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 2
Logic + 0
Cleaning + 0
Friends + 1
Level 3
Title Thinktank
Description After voicing a few creative ideas of your own to your boss, you've been bumped up to thinktank! You work one-on-one with the authors in the publishing house, inspiring fresh ideas when writer's block strikes. Sound glamorous? Actually, prepare to take a lot of abuse from authors you've offended and receive no credit for your ideas. But hey, you want this!
Wages $350
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 09.00, 17.00
Outfit Everyday Outfit
Carpool Town Car
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 0
Logic + 0
Cleaning + 0
Friends + 1
Level 4
Title Ghostwriter
Description Having connections is always useful, and at last, you get to start writing novels! Too bad you won't get any credit for them. The hours are long; the work is hard; the authors are ungrateful and you feel like tearing your hair out. And to think, you thought this would be easy...
Wages $420
Days Monday, Wednesday, Thursday, Saturday, Sunday
Workhours 06.00, 14.00
Outfit Leather Jacket
Carpool Town Car
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 1
Level 5
Title One-time author
Description A mistake at the printing press leads to one of your novels being published in your name, not the author you've been ghost writing for! Its sales are average, but you can live with that. A big bump in your pay check and your name on the shelves at last more than makes up for that. Who knows, maybe sales will even pick up.
Wages $660
Days Tuesday, Wednesday, Thursday, Friday, Saturday
Workhours 10.00, 18.00
Outfit Leather Jacket
Carpool Sedan
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 0
Level 6
Title Second-time author
Description Sales may have been average for your first novel, but your second is selling well. You have your own editor now and he's already demanding a sequel. Last week you received your first fan mail. Your reviews are good and your name is becoming more widely known. Make friends in the right places and you may find more work on your hands.
Wages $780
Days Tuesday, Wednesday, Thursday, Saturday, Sunday
Workhours 14.00, 21.00
Outfit Leather Jacket
Carpool Sedan
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 1
Creativity + 0
Logic + 1
Cleaning + 0
Friends + 2
Level 7
Title Series writer
Description Isn't it a great feeling to create well-loved characters? With multiple novels under your belt, you are now almost a household name. Your perfectly-crafted characters are either a blessing or a curse, because now you're expected to write sequel after sequel. Keep at it, and expect to sign a few autographs here and there.
Wages $925
Days Monday, Tuesday, Wednesday, Friday
Workhours 10.00, 17.00
Outfit Cheap Suit
Carpool Sports Car - Low
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 0
Logic + 2
Cleaning + 0
Friends + 2
Level 8
Title Sellout
Description Some might say you sold out, man. You would say they're jealous, and you'd be right. With royalties pouring in from your works and fan-fictions based on your characters appearing all over the internet, it's safe to say that you're number one. Technically your books are still ranking number two to three on the bestseller list... ...but everyone knows, you're number one.
Wages $1080
Days Monday, Wednesday, Friday, Sunday
Workhours 12.00, 17.00
Outfit Slick Suit
Carpool Sports Car - Mid
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 0
Creativity + 2
Logic + 2
Cleaning + 0
Friends + 1
Level 9
Title Best-selling author
Description You finally break free from that series they made you stick with, The result? Crowds form outside bookstores when your latest work hits the shelves. You are recognised on the street. Kids study your works at school, and enjoy it. All of your novels are being made into blockbusters. Keep up the good work, and there may been even more rewards coming your way...
Wages $1125
Days Monday, Wednesday, Friday
Workhours 12.00, 16.00
Outfit Slick Suit
Carpool Sports Car - Super
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 2
Creativity + 2
Logic + 1
Cleaning + 0
Friends + 1
Level 10
Title Nobel-prize-winning author
Description The Nobel Prize for literature... Awarded to only those who have made outstanding contributions to the literary field, and now your name is on that list. You've really made it now. Your name and your work will live on for centuries. You mostly work from home now, writing as much or as little as you want to gain extra income. It doesn't get any better than this!
Wages $2675
Days Monday
Workhours 13.00, 16.00
Outfit Power Suit
Carpool Limo
Cooking + 0
Mechanical + 0
Body + 0
Charisma + 2
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 1
donderdag 1 maart 2012
New career: Vampire (requested)
As I do take requests, Sims2addict9309 requested the career Vampire.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 7, 2012
And can be found here: http://bit.ly/yJBcqS
Requester sims2addict9309
Career Title Vampire
Careerreward Punching Bag
Level 1
Title Practically Human
Description Are you quite sure that you are actually a vampire? Maybe you are just a particularly nocturnal human. You need to get your act together. Charisma and body skill are essential to becoming a better vampire.
Wages 420
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 22.00, 03.00
Outfit Everyday outfit
Carpool Sports Team Bus
Level 2
Title Gopher
Description Almost every vampire is above you and can give you orders, but at least you can now look down on those who are practically human. You catch a taxi to work rather than cramming into a packed bus and enjoy a nice raise in your salary. To be a better vampire, work on your body and charisma skills. To be a better Gopher, work on you cooking, cleaning and mechanical skills.
Wages 577
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 22.00, 03.00
Outfit Swat
Carpool Taxi
Cooking + 1
Mechanical + 1
Body + 1
Charisma + 1
Creativity + 0
Logic + 0
Cleaning + 1
Friends + 0
Level 3
Title Bait
Description Finally you have your own carpool, but you are paying for it by putting your life at risk every night. Previously you never left the Headquarters whilst at work, but now you have to go out onto the streets and lure humans to where the hunter can catch them. Be careful, as you could get caught and made to face the daylight. Work on your creativity to earn a promotion back to the Headquarters.
Wages 714
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 22.00, 03.00
Outfit Burglar
Carpool Hatchback
Cooking + 1
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 0
Logic + 1
Cleaning + 0
Friends + 0
Level 4
Title Security Guard
Description You have earned a promotion back to the headquarters! Even better, they have decided to give you a position of trust. You guard the Headquarters and make sure no human can ever discover the location. To be a Hunter you need to improve your body skill.
Wages 861
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 22.00, 03.00
Outfit Security Guard
Carpool Sedan
Cooking + 1
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 0
Level 5
Title Hunter
Description You are officially halfway up the vampire corporate food chain, and as a reward you now only work 4 days a week and have a pay greater than $1000. When the bait brings an unsuspecting human close to you, you hunt food to take back to the Elders. To be promoted further, you now need to improve all your skills and make friends in the right places. Logic is particularly important.
Wages 1008
Days Monday, Tuesday, Wednesday, Thursday
Workhours 22.00, 03.00
Outfit Leather Jacket
Carpool Town Car
Cooking + 1
Mechanical + 1
Body + 1
Charisma + 1
Creativity + 0
Logic + 0
Cleaning + 0
Friends + 1
Level 6
Title Vampire Scientist
Description There are so many problems unique to vampires that human scientists just do not try to solve. For example, how to get make-up that works properly on your grey skin. Fortunately for vampires, you are trying to find the answer. Logic is your friend here, and of course if you want to be a better vampire you must still work on your charisma and body skill.
Wages 1560
Days Monday, Tuesday, Wednesday, Thursday
Workhours 22.00, 02.00
Outfit Mad Lab
Carpool Sports Car - Low
Cooking + 1
Mechanical + 1
Body + 1
Charisma + 1
Creativity + 1
Logic + 2
Cleaning + 1
Friends + 2
Level 7
Title Social Climber
Description There is no specific job title that can describe what you do for the Elders. You perform administrative tasks considered too unimportant for your direct superiors and generally oversee the day-to-day activities of vampires attending the headquarters. You consider it an honor to work for these highly respected and very powerful vampires and secretly dream of joining their ranks, if only you could get all your skills high enough.
Wages 1785
Days Monday, Tuesday, Wednesday, Thursday
Workhours 22.00, 02.00
Outfit Mayor
Carpool Sports Car - Super
Cooking + 1
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 0
Logic + 1
Cleaning + 0
Friends + 2
Level 8
Title Vampire Elder
Description There are only two people in the headquarters with more authority than you - the Grand High Vampire and the Heir To The Throne. You must work on your body skill, because the only way to be the next Heir To The Throne is by literally fighting for the position. In the meantime it would do you good to improve all your skills generally, because as a Vampire Elder you must sort out almost all problems that occur within the Headquarters.
Wages 2232
Days Monday, Tuesday, Wednesday, Thursday
Workhours 23.00, 02.00
Outfit Power Suit
Carpool Helicopter - Executive
Cooking + 1
Mechanical + 1
Body + 1
Charisma + 1
Creativity + 1
Logic + 1
Cleaning + 1
Friends + 2
Level 9
Title Heir To The Throne
Description Everyone wants to be the Heir To The Throne. You have a guaranteed job as the next Grand High Vampire when the current one dies, and in the meantime you have a salary of over $3000 a day and take a Limo to work. Of course you are in training to be the next person with utterly complete control over the Headquarters, so you have to improve your skills further. Luckily you now only work 3 days a week and have a very short working day.
Wages 3225
Days Monday, Tuesday, Wednesday
Workhours 23.00, 01.00
Outfit Captain Hero
Carpool Limo
Cooking + 1
Mechanical + 1
Body + 2
Charisma + 2
Creativity + 1
Logic + 1
Cleaning + 1
Friends + 2
Level 10
Title Grand High Vampire
Description No-one is above you. You have complete control over all vampires that attend this Headquarters. You literally hold their life in your hands. You are the most powerful vampire around, and as a result you are always a target for assassination. Therefore, when you are not running the Headquarters, you must train an Heir To The Throne to take your place when you die. It sounds harsh, but a salary of $5000 a day should sweeten the news a little.
Wages 5000
Days Tuesday, Wednesday, Thursday
Workhours 23.00, 01.00
Outfit Mast Evil
Carpool CaptHeroFlyaway
Cooking + 1
Mechanical + 1
Body + 0
Charisma + 0
Creativity + 1
Logic + 1
Cleaning + 1
Friends + 0
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 7, 2012
And can be found here: http://bit.ly/yJBcqS
Requester sims2addict9309
Career Title Vampire
Careerreward Punching Bag
Level 1
Title Practically Human
Description Are you quite sure that you are actually a vampire? Maybe you are just a particularly nocturnal human. You need to get your act together. Charisma and body skill are essential to becoming a better vampire.
Wages 420
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 22.00, 03.00
Outfit Everyday outfit
Carpool Sports Team Bus
Level 2
Title Gopher
Description Almost every vampire is above you and can give you orders, but at least you can now look down on those who are practically human. You catch a taxi to work rather than cramming into a packed bus and enjoy a nice raise in your salary. To be a better vampire, work on your body and charisma skills. To be a better Gopher, work on you cooking, cleaning and mechanical skills.
Wages 577
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 22.00, 03.00
Outfit Swat
Carpool Taxi
Cooking + 1
Mechanical + 1
Body + 1
Charisma + 1
Creativity + 0
Logic + 0
Cleaning + 1
Friends + 0
Level 3
Title Bait
Description Finally you have your own carpool, but you are paying for it by putting your life at risk every night. Previously you never left the Headquarters whilst at work, but now you have to go out onto the streets and lure humans to where the hunter can catch them. Be careful, as you could get caught and made to face the daylight. Work on your creativity to earn a promotion back to the Headquarters.
Wages 714
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 22.00, 03.00
Outfit Burglar
Carpool Hatchback
Cooking + 1
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 0
Logic + 1
Cleaning + 0
Friends + 0
Level 4
Title Security Guard
Description You have earned a promotion back to the headquarters! Even better, they have decided to give you a position of trust. You guard the Headquarters and make sure no human can ever discover the location. To be a Hunter you need to improve your body skill.
Wages 861
Days Monday, Tuesday, Wednesday, Thursday, Friday
Workhours 22.00, 03.00
Outfit Security Guard
Carpool Sedan
Cooking + 1
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 1
Logic + 0
Cleaning + 0
Friends + 0
Level 5
Title Hunter
Description You are officially halfway up the vampire corporate food chain, and as a reward you now only work 4 days a week and have a pay greater than $1000. When the bait brings an unsuspecting human close to you, you hunt food to take back to the Elders. To be promoted further, you now need to improve all your skills and make friends in the right places. Logic is particularly important.
Wages 1008
Days Monday, Tuesday, Wednesday, Thursday
Workhours 22.00, 03.00
Outfit Leather Jacket
Carpool Town Car
Cooking + 1
Mechanical + 1
Body + 1
Charisma + 1
Creativity + 0
Logic + 0
Cleaning + 0
Friends + 1
Level 6
Title Vampire Scientist
Description There are so many problems unique to vampires that human scientists just do not try to solve. For example, how to get make-up that works properly on your grey skin. Fortunately for vampires, you are trying to find the answer. Logic is your friend here, and of course if you want to be a better vampire you must still work on your charisma and body skill.
Wages 1560
Days Monday, Tuesday, Wednesday, Thursday
Workhours 22.00, 02.00
Outfit Mad Lab
Carpool Sports Car - Low
Cooking + 1
Mechanical + 1
Body + 1
Charisma + 1
Creativity + 1
Logic + 2
Cleaning + 1
Friends + 2
Level 7
Title Social Climber
Description There is no specific job title that can describe what you do for the Elders. You perform administrative tasks considered too unimportant for your direct superiors and generally oversee the day-to-day activities of vampires attending the headquarters. You consider it an honor to work for these highly respected and very powerful vampires and secretly dream of joining their ranks, if only you could get all your skills high enough.
Wages 1785
Days Monday, Tuesday, Wednesday, Thursday
Workhours 22.00, 02.00
Outfit Mayor
Carpool Sports Car - Super
Cooking + 1
Mechanical + 0
Body + 1
Charisma + 1
Creativity + 0
Logic + 1
Cleaning + 0
Friends + 2
Level 8
Title Vampire Elder
Description There are only two people in the headquarters with more authority than you - the Grand High Vampire and the Heir To The Throne. You must work on your body skill, because the only way to be the next Heir To The Throne is by literally fighting for the position. In the meantime it would do you good to improve all your skills generally, because as a Vampire Elder you must sort out almost all problems that occur within the Headquarters.
Wages 2232
Days Monday, Tuesday, Wednesday, Thursday
Workhours 23.00, 02.00
Outfit Power Suit
Carpool Helicopter - Executive
Cooking + 1
Mechanical + 1
Body + 1
Charisma + 1
Creativity + 1
Logic + 1
Cleaning + 1
Friends + 2
Level 9
Title Heir To The Throne
Description Everyone wants to be the Heir To The Throne. You have a guaranteed job as the next Grand High Vampire when the current one dies, and in the meantime you have a salary of over $3000 a day and take a Limo to work. Of course you are in training to be the next person with utterly complete control over the Headquarters, so you have to improve your skills further. Luckily you now only work 3 days a week and have a very short working day.
Wages 3225
Days Monday, Tuesday, Wednesday
Workhours 23.00, 01.00
Outfit Captain Hero
Carpool Limo
Cooking + 1
Mechanical + 1
Body + 2
Charisma + 2
Creativity + 1
Logic + 1
Cleaning + 1
Friends + 2
Level 10
Title Grand High Vampire
Description No-one is above you. You have complete control over all vampires that attend this Headquarters. You literally hold their life in your hands. You are the most powerful vampire around, and as a result you are always a target for assassination. Therefore, when you are not running the Headquarters, you must train an Heir To The Throne to take your place when you die. It sounds harsh, but a salary of $5000 a day should sweeten the news a little.
Wages 5000
Days Tuesday, Wednesday, Thursday
Workhours 23.00, 01.00
Outfit Mast Evil
Carpool CaptHeroFlyaway
Cooking + 1
Mechanical + 1
Body + 0
Charisma + 0
Creativity + 1
Logic + 1
Cleaning + 1
Friends + 0
Abonneren op:
Posts (Atom)
Older creations
-
▼
2012
(140)
-
▼
maart
(13)
- New major: Ranger's Apprentice (requested)
- New lifespan: As requested by Zaligelover
- New career: Pop Musician (requested)
- New necklace: "Cat" (requested)
- New lifespan and Universityspan: As requested by L...
- New lifespan: As requested by melaniecox
- New lifespan and petslifespan: As requested by aen...
- New pet career: Exterminator (requested)
- New teen career: Pop star (requested)
- New teen career: Magic Shop (requested)
- New career: Chinese Musician (requested)
- New career: Commercial Art (requested)
- New career: Vampire (requested)
-
▼
maart
(13)
