As I do take requests, Izziejelly requested the career Psychologist.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published Sep 5, 2012
And can be found here: http://bit.ly/QMT5Yb
IMPORTANT INFORMATION
Posts tonen met het label Psychologist. Alle posts tonen
Posts tonen met het label Psychologist. Alle posts tonen
woensdag 5 september 2012
zondag 22 juli 2012
New Conversion: Psychologist (request)
Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!
Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Psychologist!
It was requested for the Sims 2 by Izziejelly.
You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Izziejelly.
Here is the full information for the career for Sims 3. The career is located at the Hospital and the focus is on Logic, Charisma and Athletic. It has one custom tone, Study Psychology, which builds the Logic skill.
Technical Stuff:
This career was made with patch 1.34 and should work with all lower patches and patch 1.36. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)
Translating
Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.
<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>
Do that for the entire file :)
Download:
Career: http://sdrv.ms/NtZQdG
Language: http://sdrv.ms/Ma8wH3
Credit to:
Lientebollemeis, Izziejelly, the creators of s3pe
Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Psychologist!
It was requested for the Sims 2 by Izziejelly.
You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Izziejelly.
Here is the full information for the career for Sims 3. The career is located at the Hospital and the focus is on Logic, Charisma and Athletic. It has one custom tone, Study Psychology, which builds the Logic skill.
Career Levels
Psychologist Career ~ It can be a long process but if you have a love of helping people, then becoming a Psychologist could be for you!
1. Undergraduate ~ Still at university, you're working nights to pay for your courses. You sit in at psych evaluations to learn the ropes.
Wages: §8/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 6.00am ~ 6.00pm
2. Psychologist's Secretary ~ You've managed to get through university and seeing what it's like in a real psychologist's life. Make sure your boss is comfy and learn how to make coffee fast - he needs it big time!
Wages: §20/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 9.00am ~ 5.00pm
3. Psychologist Intern ~ Work on charisma and logic. It's important that your patients trust you and that you sound like you know what you're talking about. Otherwise, they may begin to think YOU'RE the one who's crazy.
Wages: §30/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 8.00am ~ 6.00pm
4. Psychologist ~ You've finally made it up to taking some of the more challenging patients. Be careful and tactful; anything could go wrong here. Make sure to relax at home because you'll have a stressful workday.
Wages: §45/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 8.00am ~ 6.00pm
5. Psychology Teacher ~ Working at SimCity West High, you're teaching juniors about psychology. Revise your facts as anything you say could affect their futures... and yours too!
Wages: §71/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 9.00am ~ 4.00pm
6. Criminal Psychologist ~ Working for the SBI (Sim Bureau of Investigation), you're helping to rehabilitate criminals who have come off the streets. Make a bad move and you and the rest of the population could be in trouble.
Wages: §77/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 9.00am ~ 6.00pm
7. Criminal Profiler ~ You know what makes criminals thick. Further up on the SBI ladder, you're out there doing the catching. Make sure to pump up your body skill, as you could be doing a lot of running.
Wages: §79/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 9.00am ~ 9.00pm
8. Psychology Lecturer ~ Teaching those who you once were, you're helping the undergrads at SimCity University to pass their majors and make a living.
Wages: §133/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 9.00am ~ 6.00pm
9. Head of Psychology ~ You're now Head of Psychology at the university you once attended. Be proud of yourself, but remember to keep on learning.
Wages: §166/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 9.00am ~ 6.00pm
10. Head Psychologist ~ You've made it! You work at SimCity Mental Hospital for the Insane, working to find out about all sorts of different people and help them back to how they were.
Wages: §218/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 10.00am ~ 6.00pm
Psychologist Career ~ It can be a long process but if you have a love of helping people, then becoming a Psychologist could be for you!
1. Undergraduate ~ Still at university, you're working nights to pay for your courses. You sit in at psych evaluations to learn the ropes.
Wages: §8/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 6.00am ~ 6.00pm
2. Psychologist's Secretary ~ You've managed to get through university and seeing what it's like in a real psychologist's life. Make sure your boss is comfy and learn how to make coffee fast - he needs it big time!
Wages: §20/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 9.00am ~ 5.00pm
3. Psychologist Intern ~ Work on charisma and logic. It's important that your patients trust you and that you sound like you know what you're talking about. Otherwise, they may begin to think YOU'RE the one who's crazy.
Wages: §30/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 8.00am ~ 6.00pm
4. Psychologist ~ You've finally made it up to taking some of the more challenging patients. Be careful and tactful; anything could go wrong here. Make sure to relax at home because you'll have a stressful workday.
Wages: §45/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 8.00am ~ 6.00pm
5. Psychology Teacher ~ Working at SimCity West High, you're teaching juniors about psychology. Revise your facts as anything you say could affect their futures... and yours too!
Wages: §71/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 9.00am ~ 4.00pm
6. Criminal Psychologist ~ Working for the SBI (Sim Bureau of Investigation), you're helping to rehabilitate criminals who have come off the streets. Make a bad move and you and the rest of the population could be in trouble.
Wages: §77/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 9.00am ~ 6.00pm
7. Criminal Profiler ~ You know what makes criminals thick. Further up on the SBI ladder, you're out there doing the catching. Make sure to pump up your body skill, as you could be doing a lot of running.
Wages: §79/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 9.00am ~ 9.00pm
8. Psychology Lecturer ~ Teaching those who you once were, you're helping the undergrads at SimCity University to pass their majors and make a living.
Wages: §133/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 9.00am ~ 6.00pm
9. Head of Psychology ~ You're now Head of Psychology at the university you once attended. Be proud of yourself, but remember to keep on learning.
Wages: §166/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 9.00am ~ 6.00pm
10. Head Psychologist ~ You've made it! You work at SimCity Mental Hospital for the Insane, working to find out about all sorts of different people and help them back to how they were.
Wages: §218/hour
Days: Monday, Tuesday, Wednesday, Thursday, Friday
Work hours: 10.00am ~ 6.00pm
Technical Stuff:
This career was made with patch 1.34 and should work with all lower patches and patch 1.36. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)
Translating
Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.
<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>
Do that for the entire file :)
Download:
Career: http://sdrv.ms/NtZQdG
Language: http://sdrv.ms/Ma8wH3
Credit to:
Lientebollemeis, Izziejelly, the creators of s3pe
Labels:
Adult career,
career,
Conversion,
MissyHissy,
Only on S2I,
Polish,
Psychologist,
The Sims 3
Abonneren op:
Posts (Atom)
Older creations
-
▼
2013
(108)
-
▼
juni
(10)
- New remake Sims 3 Late Night: Film - Superstar Actor
- New remake Sims 3 Late Night: Film - Distinguished...
- New remake Sims 3 Ambitions: Medical
- New remake Sims 3 Ambitions: Investigator
- New remake Sims 3 Ambitions: Ghosthunter
- New remake Sims 3 Ambitions: Firefighter
- New remake Sims 3 Ambitions: Fashion Stylist
- New remake Sims 3 Ambitions: Education
- New building: Day Dream 3322
- New remake Sims 3 Ambitions: Architecture
-
▼
juni
(10)
