Policy

Pagina's

IMPORTANT INFORMATION

Posts tonen met het label request. Alle posts tonen
Posts tonen met het label request. Alle posts tonen

zondag 5 mei 2013

New teen career: Miles Tails Prower (requested)

As I do take requests, WiiGuy59103 requested the career Miles Tails Prower.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC

Icon:


Screenshot:


Download:
S2I: http://sdrv.ms/102ioJi
TSR: http://bit.ly/126Uj2H

 



maandag 22 april 2013

New career: Consulting Detective (requested)

As I do take requests, Dragon_Girl90 requested the career Consulting Detective.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published April 22, 2013
And can be found here:
S2I: http://sdrv.ms/12GnCJY
TSR: http://bit.ly/16Ngn5q

 

zaterdag 20 april 2013

New changes to career: Tattoo artist adding reward

Risuriepu requested the following:
Changes to Tattoo career: adding reward Fingerprinting scanner (outfit: everyday outfit).

Download:


Risuriepu made this request by filling out this form: http://bit.ly/p9ymWC

dinsdag 16 april 2013

New bedding: Paisley Patter (requested)

This is a new bedding made for all beds in The Sims 2 (including EP beds).
No EP required.


Screenshot:


Download:

If you have a request please go here: http://bit.ly/p9ymWC

Creator Notes
Please, do not re-upload or use for anything but in game play, I accept requests.

Credits
SimPe, http://bit.ly/qFDuaf, http://bit.ly/Z1YNKr

zondag 14 april 2013

New bedding: Monkees Blue (requested)

This is a new bedding made for all beds in The Sims 2 (including EP beds). It was requested by Snoopy21979.
No EP required.


Screenshot:



Download:

If you have a request please go here: http://bit.ly/p9ymWC

Creator Notes
Please, do not re-upload or use for anything but in game play, I accept requests.

Credits
SimPe, http://bit.ly/qFDuaf

zondag 3 maart 2013

New teen career: Student Council (requested)

As I do take requests, rosedreamer101 requested the teen career Student Council.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC

Icon:


Screenshot:





Download:
MTS: (moderation queue)

I also accept requests full time!
If you have a request please go here: bit.ly/p9ymWC

Please, don't upload this career anywhere. If you want to share it, share by the button Twitter, Facebook,...

donderdag 28 februari 2013

Post/upload on Sims 2 Idea


  1. Let me know you want to upload/post.
    1. Information I need:
      1. Your nickname
      2. Your gmail account e.g. s2i.request@gmail.com
      3. Creations you already made or what you want to make
      4. How and where you want to share your creations
        1. Your own Skydrive, mediafire, MTS, TSR,…
        2. Sent it to me to put it on my Skydrive
      5. You can also post ideas like situations, challenges,… Just let me know!
    2. Send me a PM at MTS or TSR à nickname Lientebollemeis
    3. Send me an e-mail à s2i_request@hotmail.be
  2.  Log in to your gmail account and confirm the invitation I sent.


  3.  Go to the blog and sign in with your Google account on the right top of the screen


  4. Press this icon to make a new blogpost
  5. Now you can write a title for the post and write a text.

    On the right side there are more options to add labels, schedule the post, ...


  6. Press the icon "Publiceren"="post" to post the blogpost or press "opslaan"="save" to save the post as a concept.

    If you press “save” you need to press “sluiten”=”close” to go back
  7. When you go back: On your left side you see "instellingen"="settings"


  8. There you can setup an e-mailaddress to send to, so the blogpost is saved or posted right away.
  • Then you don't need to go to the blog every time to make a new post.


      • secretWords: Use a secret word only you know so only you can post in your name on the blog.
      • E-mail direct publiceren: The e-mail you send to this e-mailaddress will be posted on the blog right away.
      • E-mails opslaans als conceptbericht: When you send an e-mail to this address the post will be saved and not published. So you can edit it in when going to the blog and schedule, add labels,...
  • After you decided what option you'll use you press the button "instellingen opslaan"="save settings" on the right top side.

  • Example:
    • In this example the e-mailaddress to send to is: s2i.request.cornflakes@blogger.com
    • The posts will be saved first and won't be published right away.



P.S.: I’d like to keep the style of the blog the same for every blogpost. E.g.: Title always starts with “New”; always using the same labels for easy search on the blog;…
I give myself the right to change your blogpost to let it be the same style as all other blogposts. I won’t change the content unless it’s insulting or something like that.

zondag 24 februari 2013

New things to do yourself at S2I

This is not only a blog to download and to watch, but you can also do things yourself:

Be active on this blog:

  • Add chance cards here: http://bit.ly/SjF9D6
    • There are many careers I made which don't have chance cards YET!
      I'm looking for very creative people who are willing to write chance cards for the careers I upload.
  • Translate a career here: http://bit.ly/P1ejML
  • Check this first:
  • Post/upload on Sims 2 Idea yourself here: http://bit.ly/13eYKMG
    • If you don't create you can post interesting downloads (always credit the right people if you do), challenges, situations, family tree, poll,....


donderdag 7 februari 2013

New career: Professional Gymnast (requested) (version 2)

As I do take requests, LaniLuvvYhu requested the career Professional Gymnast (slightly different version).
This is a career for adults. It's EP compatible and has its own GUID (overwrite of earlier version possible).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC

Icon:


Screenshot:


Download:
S2I: http://sdrv.ms/11qn9PN
TSR: http://bit.ly/VGDaZP
MTS: (Moderation queue)

 



I also accept requests full time!
If you have a request please go here: bit.ly/p9ymWC

Please, don't upload this career anywhere. If you want to share it, share by the button Twitter, Facebook,...

donderdag 24 januari 2013

New Necklace: Name "Jessica" (requested)

This is a silver necklace. It's a name "Jessica" requested by Jessie_190190 
- For females: teen to elder
- Can be worn with every kind of outfit.



Don't forget to download the mesh here: http://bit.ly/hwwSiD
Download necklace: http://sdrv.ms/Xtqg3m
Download necklace on TSR (Jan 31, 2013): http://bit.ly/XkGUSc

If you also have a request please go here: http://bit.ly/p9ymWC

dinsdag 15 januari 2013

New lifespan: Adult 110 (requested)

As requested by karinlundq, here is the following lifespan:

baby 6
toddler 8
child 10
teen 14
adult 110
elder 30

Download: http://sdrv.ms/VAiGWe


You can have only one lifespan in your game!
Go here for more information: http://bit.ly/NFgAjq

vrijdag 11 januari 2013

New request: changes to careers

cjsmalls requested the following:
Change careers outfits to everyday for the following careers: Banking, Real Estate (Estate Agent), tattoo artist

Here they are:



cjsmalls made this request by filling out this form: http://bit.ly/p9ymWC

zaterdag 1 december 2012

New Unmissable CC: TNW: The Sims 2 - Sub Sandwiches

This was actually a request of me to TheNinthWave who was so kind to create this for me.
It's really Unmissable in your downloadfolder and one of my favourite CC.

TheNinthWaveSims: The Sims 2 - Sub Sandwiches: Requested by Lient the other creator here on the site. It's sub sandwiches. For lunch and dinner only as she wanted. Found in your sim's fri...

dinsdag 27 november 2012

New requests made (but how...)

November was a good month for requests comparing to the months October and September.
I haven't had the time to update the requestform. It does take longer than you'd think as there are so many different ways people do requests.


Only requests made by the correct form here on my blog are official and valid.

No problem for me to accept requests by other social media (mail, Facebook, Twitter, TSR, MTS, comments,...) but then you don't have the right to complain that your requests takes very long or is even never made!

Thanks for understanding!

maandag 24 september 2012

New FAQ: More help for doing a career request

Some people let me know that they follow the instructions to the letter, but still their request is rejected.
If they really would have done everything like the instructions say you need to check, the request would have been accepted!

  • The reason why the instructions are this strict, is because I have less time to create so I don't have the time to correct any tiny mistake.
  • I also want to assure the downloaders they download a perfect finished creation.
    • Quality is really important and I want to keep up my reputation as Selected Artist (TSR) and Picked Creator (MTS)
  • I start creating the career immediatly (I just view at the request quickl) so I need to have a blind trust the request is perfect
I check following things: 
  • Spelling and grammar:
    • I read the descriptions very quickly. If I see just the one mistake, I stop looking further.
      • Punctuation
      • Do the sentences make any sense?
      • Apostrophe's
      • No abbreviations (kinda, gonna,...)
      • Capital letter
      • Form of the sentence
  • Descriptions:
    • This is mostly based on MTS's rules. They reject careers for this:
      • Growth in the career
      • Creativity (no repetition)
      • Length of description
  • Wages:
    • All wages need to be within the indicated range. If one is not, the request is rejected
  •  Skills:
    • If any of the needed skills at level ten is higher than 10, the request is rejected.
    • HINT
      • Before you start filling out the form, write on a piece of paper which and how many skillpoints are needed for every level.
        That way you can't be mistake why filling out the form.


This is all found very clearly in the instructions. Lot of requests have been accepted so there are people who do follow the instructions correctly.

The form is made in such a way it's nearly impossible to have a reason for rejection.
You need to check four main things. If these are good, the request is accepted asap:

  • Spelling and grammar
  • Creativity (length + growth)
  • Wages (a clear range is always indicated)
  • Skills (make a clear schedule for yourself beforehand)

zaterdag 22 september 2012

New career: Kindergarten Teacher (requested)

As I do take requests, sarasuniverse requested the career Kindergarten Teacher.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC

Icon:

Screenshot:












Download:
The creation will be/was published Sep 22, 2012
And can be found here: http://bit.ly/QJx9db