Policy

Pagina's

IMPORTANT INFORMATION

Posts tonen met het label aspiration adjustor. Alle posts tonen
Posts tonen met het label aspiration adjustor. Alle posts tonen

vrijdag 28 september 2012

New insiminator option explained: Aspiration adjustor


Where do I download the insiminator?
- You can download it here: Downloads
- The Insiminator is compatible with ALL expansions.
Where do I find it in game?
Elektronics ---> All

Aspiration adjustor


For this adjustor there are following options:




  • My Aspiration Score
    • Change the aspiration score.
  • Group Aspiration Score
    • Change the aspiration score of all sims.
  • Set Aspiration Score
    • Decide which level your aspiration should be.
  • Add Aspiration Points
    • Add aspiration points to buy aspiration awards.
  • Change Aspiration
    • Change the aspiration, turn ons and turn offs of your sim.
  • Randomize
    • The game chooses the aspiration for you.
  • Aspiration Score Decay
    • I don't know what this does.
  • Aspiration Score Lock
    • The aspiration score of your sim doesn't change anymore.
  • Lifetime Platinum
    • Have lifetime Platinum like forfilling the lifetime wish.
  • Lifetime Wants
    • Lifetime wish/want is changed randomly.
  • Wants Panel
    • Add a lock or slot to the wants and fear panel