Policy

Pagina's

IMPORTANT INFORMATION

Posts tonen met het label Books. Alle posts tonen
Posts tonen met het label Books. Alle posts tonen

zaterdag 12 januari 2013

New random item: New books: 14 Harry Potter books in 2 versions (7 British and 7 American


This is a new random item.
I have so many uploaded creations that it's easy to miss one. So once in a while I'll make a blogpost with a random item. (When there's a new comment on an old upload, I'll make such a blogpost.)


Click image for larger version  Name:  OverviewAllbooks.jpg Size:  49.0 KB

Download here:

Today I present you 14 Harry Potter books. 7 British version and 7 American version. The textures were originally made by Nate92488. These are the originals:http://nene.modthesims.info/d/240935
I thought it was very annoying that it were 14 separate books so I made recolors of it.

These books are new objects and no replacements.
The American and British versions have different GUIDs. So you will see two books in Buy Mode (which you then can recolor in game).
You can find them in Hobbies -> Knowledge
They cost $250 each. To recolor them (in game) it always costs $15.

CEP is needed to make these work
The mesh is included so you don’t need to download anything. Thanks to Nate92488.

I accept requests. It’s no problem to make a new book with a cover you’d like: Lord of the Rings, Twilight, Stephen King, …

Polygon counts
Cover: 120 polys
Shadow: 2 polys

Other books:
Twilight: http://www.thesimsresource.com/downloads/1016029

Credits go to:
SimPe, Nate92488 for the Harry Potter books.

Have fun!