Policy

Pagina's

IMPORTANT INFORMATION

maandag 27 augustus 2012

New career: Jeffersonian (requested)

As I do take requests, L.M.S.2110 requested the career Jeffersonian.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC

Screenshot:


The creation will be/was published Aug 26, 2012
And can be found here: http://bit.ly/U6tJDp

 

New FAQ: How to install custom content?


The Downloadfolder
The first step is to determine whether the download folder exists. It should be in a folder called My Documents. Depending on which version of Windows you are running, it is either on your desktop or on your Start Menu.
In your My Documents folder should be a folder called "EA Games". If you click on it, there should be a folder inside called "Sims 2". Clicking on that brings up several more folders, but the one you are looking for is called "Downloads". This is where all of your custom content should go.
If you do not see the Downloads folder, it is easy to create: Simply click "File" and then "New". A submenu will come up. Click on "Folder". This will generate a new folder. Rename that folder "Downloads". Now you are ready to install your custom content.

File you'll need to use:Files ending in ".zip" need to be opened with an unzipper. Some versions of Windows already have one installed, but the older versions don't (older than XP). To open these folders, you will need a program called "Winzip". You can use google and find it on the internet.
Files ending in ".rar" need to be opened with a program like "WinAce" or "WinRAR". Again. google will help you find this program.
Files ending in ".package" should go to your downloads folder directly. These files are found in zips and rars. Sometimes these files are prepackaged in another type of file that ends in ".Sims2Pack". These files will have a different picture and if you click them, they will start a program to install your custom content for you. All you have to do is open the file, click the "Install" button, and then the "Done" button and you're all set. It puts it into the correct folder for you. 


zondag 26 augustus 2012

New Conversion: Teen Babysitter


Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Babysitter!

It was requested for Sims 2 by Superstar001.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Superstar001.


Here is the full information for the career for Sims 3. The career is located at the Hospital. It has one custom tone, Chat to Children, which builds the Charisma skill.

                                                    






Technical Stuff:

This career was made with patch 1.36 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :

Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)

Download:
Language: http://sdrv.ms/MRb1iT

Credit to:
Lientebollemeis, Superstar001 and the creators of s3pe

zaterdag 25 augustus 2012

New remake Sims Bustin' Out: Fashion Victim

This is a remake of the known Maxis' (EA Games) career.
It's not available in The Sims 2 Base Game.

Icon: 


Screenshot:





Download:


A lot of people asked to create this and finally I remade them all.
Here's an overview of all the remade careers (+ more information on how and why I made this).
(This career is not seen in the overview as I created it later.)

I also accept requests full time!
If you have a request please go here: bit.ly/p9ymWC

Credits:
All people who requested one or several of these careers
EA Games and Maxis
SimPE
This site without I couldn't create this (all information about careers SPOILER!)
- http://bit.ly/OAqLlK
-- (I'm not responsible for changes on this site. If something is not the same as the careers I made that's because it has been changed in the meantime.)

IMPORTANT
I do NOT  take any credit for the levels, descriptions, promotional skills needed, etc. as they are just taken from the Maxis' careers. I tried my best with everything I could not supply from the Maxis career.

Please, don't upload these careers anywhere. If you want to share them, share by the button Twitter, Facebook,...
Or share this link anywhere: http://bit.ly/NcnSNW

vrijdag 24 augustus 2012

New career: Prison Service (requested)

As I do take requests, Jackm requested the career Prison Service.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published Aug 29, 2012
And can be found here:

 

woensdag 22 augustus 2012

Translated careers (Dutch, German, Korean, Italian, Swedish, Thai) Update 20130223

There are already a few people who are willing to translate several of my careers.
Here's the blogpost where I name them with the language they will translate the careers in.
If you also want to translate, please, go here: http://bit.ly/P1ejML

Dutch:
- Meteorology - By Lientebollemeis
- Cosmetology - By Lientebollemeis
- Wedding Planner - By Lientebollemeis

German:
- Meteorology - By PalmBeach
- Rock Star - By Spinell
- Historian Of Art - By Newsjunkie
- Pro Wrestling - By Newsjunkie
- Banking - By Newsjunkie
- Adult Education NCIS - By Newsjunkie
- Cosmetology - By Newsjunkie
- Prison Service - By Newsjunkie
- Plastic Surgeon - By Newsjunkie
- Teen Babysitter - By Newsjunkie
- Marine Biologist - By PalmBeach
- Grilled Cheese - By PalmBeach
- Psychologist - By PalmBeach
- Teen career Helping Hand - By Mona1863
- Teen career Fashion - By Mona1863
- Teen career Cheerleader - By Mona1863
- Teen career Ballerina - By Mona1863
- Teen career Pop Star - By Mona1863

Korean:
- Mafia - By tlrtja
- Grilled Cheese - By tlrtja

Italian:
- Kindergarten Teacher - By ValerieAnderson
- Cosmetology - By ValerieAnderson
- Psychologist - By ValerieAnderson
- Broadcast Journalism - By Arres_oja
- Rock Star - By Arres_oja

Swedish:
- Steampunk Career (Coming soon) - By Freakish Academy

Thai:
- Grilled Cheese - By Ginchan_Salin




P.S.: If I forgot someone, please, let me know.

dinsdag 21 augustus 2012

Help wanted: Looking for new creators to publish on my blog.

As you might have noticed Himawara106 and MissyHissy are two new creators on my blog.
They convert my sims 2 career to sims 3.

It goes really well working together with other creators who post on my blog.

I would love other creators to post their creations on my blog too.

If you're interested: please, go here: http://bit.ly/NZRJG4

maandag 20 augustus 2012

Remake of all Maxis' careers for Sims 2

A lot of people already requested some of these careers. This is a huge project of over 30 careers.
I remade all careers available in Sims 1 and 3 (Sims 2 careers are available for Sims 2 of course).
- When a career was double I only created it once. E.g.: Paranormal in Sims 1 & 3 is exactly the same so then I only create it once (this is just an example. I don't know if it's true for Paranormal)
- It was hard to find good icons. I hope they're satisfactionary.
- For some careers I used the same Icon (E.g. Spa Specialist and receptionist) So there are more careers than icons.
- It's possible you see some careers twice (E.g. Entertainment). They have different descriptions, hours, wages,... So I consider them as different careers.
- I used this site for all information I needed: http://bit.ly/OAqLlK
-- If some information wasn't availble, I made it up myself

I started this project at the beginning of 2011. After over 1,5 year it's finally uploaded.
Now I only hope you like it.



Click the button to see what's included:




Download (overview so you can choose which careers you download):
http://sdrv.ms/NBD1nl

Credits:
All people who requested one or several of these careers
EA Games and Maxis
SimPE
This site without I couldn't create this (all information about careers SPOILER!)
- http://bit.ly/OAqLlK
-- (I'm not responsible for changes on this site. If something is not the same as the careers I made that's because it has been changed in the meantime.)

IMPORTANT
I do NOT  take any credit for the levels, descriptions, promotional skills needed, etc. as they are just taken from the Maxis' careers. I tried my best with everything I could not supply from the Maxis career.

zondag 19 augustus 2012

New Conversion: Tattoo Artist (request)

Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Tattoo Artist!
It was requested for the Sims 2 by Anaiyia.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Anaiyia.


Here is the full information for the career for Sims 3. The career is located at the Day Spa and the focus is on Painting. It has two custom tones, Practise Tattooing, which builds the hidden Tattooing skill (if you have Ambitions installed) and Design Artwork, which builds the Painting skill. I don't know what will happen if you do not have Ambitions installed and use the Practise Tattooing tone.






Technical Stuff:

This career was made with patch 1.36 and should work with all lower patches. It requires only the base game to run (Although will require Ambitions for the first custom tone to work) and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)

Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)

Download:
Language: http://sdrv.ms/PnVnee

Credit to:
Lientebollemeis, Anaiyia and the creators of s3pe

vrijdag 17 augustus 2012

New career: Plastic Surgeon (requested)

As I do take requests, Lavaster requested the career Plastic surgeon.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published Aug 22, 2012
And can be found here: http://bit.ly/On7ZRu

 

donderdag 16 augustus 2012

New career: Model (requested)

As I do take requests, sheryl_yq requested the career Model.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published Aug 18, 2012
And can be found here: bit.ly/R8ifj1

 

dinsdag 14 augustus 2012

Help wanted: Looking for creative people to write chance cards.

As you might have noticed not all of my uploaded careers have chance cards.
Requesters don't need to provide chance cards by start, but it's a nice addon.

As I'm not at all creative myself to write chance cards about careers I don't know anything about (the requester does), I'm looking for people who are creative and want to write chance cards.

If you're interested: please, go here: http://bit.ly/NZRJG4

zondag 12 augustus 2012

New Conversion: Broadcast Journalism (request)

Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Broadcast Journalism!

It was requested for the Sims 2 by Shout5.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Shout5.


Here is the full information for the career for Sims 3. The career is located at the Business and Journalism Building and the focus is on Charisma and Writing. It has two custom tones, Write Reports, which builds the Writing skill and Conduct Interviews, which builds the Charisma Skill. This career does have uniforms for levels 3-10.







  

Technical Stuff:

This career was made with patch 1.36 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)


Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)


Download
Career: http://sdrv.ms/MPdHyD
Language: http://sdrv.ms/MpZWF3

Credit to:
Lientebollemeis, Shout5 and the creators of s3pe

vrijdag 10 augustus 2012

New career: NCIS (general) (requested)

As I do take requests, trumpet95 requested the career NCIS (general).
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published Aug 15, 2012
And can be found here: http://bit.ly/TqSPNc 

donderdag 9 augustus 2012

New lifespan: Adult 200 days (requested)


As I do take requests, HarukasKitten requested the following lifespan:

Babies: 3 days
Toddlers: 20 days
Children: 60 days
Teens: 80 days
Adults: 200 days
Elders: 20 days

If you also have a request, please go here: http://bit.ly/p9ymWC

Screenshot:


Download:
Lifespan: http://sdrv.ms/Mp49W9

Credits:
SimPE, the requester (see above), http://bit.ly/fSnciT

zondag 5 augustus 2012

New Conversion: Professional Ballerina (request) Update French 20121216

Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Professional Ballerina!
It was requested for the Sims 2 by VikiAREi.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and VikiAREi.


Here is the full information for the career for Sims 3. The career is located at the Theatre and the focus is on Athletic, with a bit of Charisma, Cooking and Painting. It has one custom tone, Warm Up, which builds the Athletic skill. 




 



Technical Stuff:

This career was made with patch 1.36 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)

Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)

Download:
Career: http://sdrv.ms/QCPmgO
Language: http://sdrv.ms/ORJsoH

Credit to:
Lientebollemeis, VikiAREi and the creators of s3pe