Policy

Pagina's

IMPORTANT INFORMATION

Posts tonen met het label Mesh. Alle posts tonen
Posts tonen met het label Mesh. Alle posts tonen

zondag 7 april 2013

New mesh: Clothes meshes

Something new is started at S2I. For the very first time I tried to create clothes and I must say I like the first result so I want to make more clothes.
In this post you can find the meshes I used to create clothes.


www.lianasims2.net

New clothes: Beau est belle (dress AF and YAF)

This is the first time I made clothes. It's a dress made for Young Adult Females and Adult Female sims.
The mesh is made by liana at www.lianasims2.net


IMPORTANT MESH NEEDED
You can find the mesh here: http://bit.ly/ZG9Kvg
The mesh needed is LS155

Screenshot:

Download:

Credit:

donderdag 14 maart 2013

New mesh: Nails

This is a mesh for nails.
You need this for every nailrecolor to work. (soon on S2I)

Download:
http://sdrv.ms/10s06iR



Credit:
http://www.lianasims2.net

maandag 23 augustus 2010

MESH necklaces on MTS & TSR

I uploaded some necklaces  on TSR. In order for those necklaces to work, you need a MESH.That can be found here.
With a lot of thanks to Dr_Pixel on MTS. 
The necklaces Alphabet Black Arial (for females) can be found here: http://www.thesimsresource.com/downloads/1002898


Attachment Female MESH: MESH_DPXLalphaEaringsNecklace080405.zip Downloads:
Attachment Male MESH: MESH_DPXL122705MaleNecklace.zip Downloads: