Policy

Pagina's

IMPORTANT INFORMATION

Posts tonen met het label Broadcast. Alle posts tonen
Posts tonen met het label Broadcast. Alle posts tonen

woensdag 3 oktober 2012

New career: Broadcast Journalism (requested)

As I do take requests, Shout5 requested the career Broadcast Journalism.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published Oct 3, 2012
And can be found here: http://bit.ly/RykVXq

 

zondag 12 augustus 2012

New Conversion: Broadcast Journalism (request)

Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Broadcast Journalism!

It was requested for the Sims 2 by Shout5.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Shout5.


Here is the full information for the career for Sims 3. The career is located at the Business and Journalism Building and the focus is on Charisma and Writing. It has two custom tones, Write Reports, which builds the Writing skill and Conduct Interviews, which builds the Charisma Skill. This career does have uniforms for levels 3-10.







  

Technical Stuff:

This career was made with patch 1.36 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)


Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)


Download
Career: http://sdrv.ms/MPdHyD
Language: http://sdrv.ms/MpZWF3

Credit to:
Lientebollemeis, Shout5 and the creators of s3pe