Patch 1.31~1.36: The Careers - Phase Ten
Patch 1.38 ~ 1.39: The Careers - Phase Eleven
Patch 1.42: The Careers - Phase Twelve
for this career to show up in-game!
Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Rock Star!
It was requested for Sims 2 by draamaqueen.
You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and draamaqueen.
Here is the full information for the career for Sims 3. The career has 10 levels and is located at the Theatre. It has one custom tone, Practise Music, which builds the Guitar, Bass, Drums and Piano skills. Only the base game is required, although Late Night is needed for the Bass, Drums and Piano skills to gain.
Technical Stuff:
This career was made with patch 1.42 and should work with all lower patches. It requires the Base Game and should work with any other combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)
Translating
Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.
<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>
Do that for the entire file :)
Download:
Career: http://sdrv.ms/10ZV2CO
Language String: http://sdrv.ms/XX0kRW
Credit to:
Lientebollemeis, draamaqueen and the creators of s3pe
