Policy

Pagina's

IMPORTANT INFORMATION

Posts tonen met het label education adjustor. Alle posts tonen
Posts tonen met het label education adjustor. Alle posts tonen

woensdag 13 februari 2013

New insiminator option explained: Education adjustor


Where do I download the insiminator?
- You can download it here: Downloads
- The Insiminator is compatible with ALL expansions.
Where do I find it in game?
Elektronics ---> All

Education adjustor


For this adjustor there are following options:


Use this best with a teen or child as an active sim.
This adjustor is very useful with University.


  • Secret Society (Option for (young) adults)
    • Be added to a Secret Society in University.
  • Influence Points
    • Change the level of the influence points.
  • Influence Level
    • Change the influence level.
  • Class Performance
    • Change the schoolmarks
  • School Type
    • Private school
    • Public school
    • No school
    • (Other downloaded schooltypes)