Policy

Pagina's

IMPORTANT INFORMATION

Posts tonen met het label Cosmetology. Alle posts tonen
Posts tonen met het label Cosmetology. Alle posts tonen

zondag 8 juli 2012

New Conversion: Cosmetology (requested)


Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten (http://nraas.wikispaces.com/Careers+Phase+Ten) for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Cosmetology! http://www.modthesims.info/download.php?t=415287 
It was requested for the Sims 2 by Fatal_syn.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Fatal_syn.


Here is the full information for the career for Sims 3. The career is located at the Day Spa and the focus is on Logic and Charisma. It has one custom tone, Chat to Customers, which builds the Charisma skill. 



Technical Stuff:

This career was made with patch 1.34 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)

Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)

Download:
Career: http://sdrv.ms/LD6igE
Translate: http://sdrv.ms/OCiMbN

Credit to:
Lientebollemeis, Fatal_syn and the creators of s3pe

vrijdag 15 juni 2012

New career: Cosmetology (requested)

As I do take requests, Fatal_syn requested the career Cosmetology.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published June 20, 2012
And can be found here: http://bit.ly/MXA6IC