Policy

Pagina's

IMPORTANT INFORMATION

Posts tonen met het label Sonic the Hedgehog. Alle posts tonen
Posts tonen met het label Sonic the Hedgehog. Alle posts tonen

zondag 5 mei 2013

New teen career: Miles Tails Prower (requested)

As I do take requests, WiiGuy59103 requested the career Miles Tails Prower.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC

Icon:


Screenshot:


Download:
S2I: http://sdrv.ms/102ioJi
TSR: http://bit.ly/126Uj2H

 



dinsdag 18 december 2012

New Random Item: New SimsVideo: Sonic The Hedgehog Ep 1 (requested)

This is a new random item.
I have so many uploaded creations that it's easy to miss one. So once in a while I'll make a blogpost with a random item. (When there's a new comment on an old upload, I'll make such a blogpost.)



Download here:

This is a Set with several Items
This download has Requirements!

Description
Episode 1 of Sonic The Hedgehog divided in 15 parts to match SimsTV.

My tutorial to make your own SimsVideo:http://bit.ly/qfOtn8
You may upload the video's you make if you credit me with a link to the tutorial!
Creator Notes
Please, do not re-upload or use for anything but in game play, I accept requests.
Credits
SimPE, the requester (see title/thread),http://bit.ly/qFDuaf

woensdag 12 september 2012

New career: Sonic The Hedgehog (requested)

As I do take requests, Sonicboom12 requested the career Sonic The Hedgehog.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published Sep 12, 2012
And can be found here: http://bit.ly/R5QuTS