As requested by karinlundq, here is the following lifespan:
baby 6
toddler 8
child 10
teen 14
adult 110
elder 30
Download: http://sdrv.ms/VAiGWe
You can have only one lifespan in your game!
Go here for more information: http://bit.ly/NFgAjq
IMPORTANT INFORMATION
Posts tonen met het label Mod. Alle posts tonen
Posts tonen met het label Mod. Alle posts tonen
dinsdag 15 januari 2013
vrijdag 5 oktober 2012
New insiminator option explained: For every adjustor
Where do I download the insiminator?- You can download it here: Downloads- The Insiminator is compatible with ALL expansions.Where do I find it in game? Elektronics ---> All |
- Delete: Delete this adjustor (Not wise to do)
- Information: This option is useless
- Change model: Change the model of the adjustor
Labels:
boolprop,
For every adjustor,
Insiminator,
Mod,
The Sims 2
dinsdag 2 oktober 2012
New Insiminator option explained: Social Adjustor
Where do I download the insiminator?
- You can download it here: Downloads
- The Insiminator is compatible with ALL expansions.
- You can download it here: Downloads
- The Insiminator is compatible with ALL expansions.
Where do I find it in game?
Elektronics ---> AllSocial adjustor
For this adjustor there are following options:
- Lot Jealousy
- Turn off the jealousy on your lot.
- Turn off the jealousy on your lot.
- New Name
- Change the first name of a sim.
- Fix Appearance
- Choose between these two:
- Make Over
- Change appearance (like the mirror does)
- Face Lift
- Choose the sim you want to give a plastic surgery (like the CAS-screen)
- Choose the sim you want to give a plastic surgery (like the CAS-screen)
- Make Over
- Choose between these two:
- Tanning
- Change the tanning level.
- Change the tanning level.
- Gestures
- Add or remove gestures your sims can use.
- Add or remove gestures your sims can use.
- Timer
- Make the timer for parties, a date,... longer or shorter.
- Make the timer for parties, a date,... longer or shorter.
- Influence Level
- Change the influence level.
- Change the influence level.
- Influence Points
- Change the influence points level
Labels:
boolprop,
Insiminator,
Mod,
social adjustor,
The Sims 2
donderdag 9 augustus 2012
New lifespan: Adult 200 days (requested)
As I do take requests, HarukasKitten requested the following lifespan:
Babies: 3 days
Toddlers: 20 days
Children: 60 days
Teens: 80 days
Adults: 200 days
Elders: 20 days
If you also have a request, please go here: http://bit.ly/p9ymWC
Screenshot:
Download:
Lifespan: http://sdrv.ms/Mp49W9
Credits:
SimPE, the requester (see above), http://bit.ly/fSnciT
donderdag 2 augustus 2012
New pregnancyspan: 9 months of pregnancy (resquested)
As I do take requests, PeachieKene requested the following pregnancyspan:
First Trimester = 312 hours (13 days)
Second Trimester = 312 hours (13 days)
Third Trimester = 312 hours (13 days)
This goes perfect with my Project Realistic Ages: 1 Sim day = 1 Real Life Week
If you also have a request, please go here: http://bit.ly/p9ymWC
Screenshot:
Download:
Pregnancyspan: http://sdrv.ms/LRwveQ
Credits:
SimPE, Insiminator, the requester (see above), http://bit.ly/fSnciT
Labels:
29 days,
Mod,
Pregnancyspan,
Project,
Project Realistic Ages
maandag 21 mei 2012
New lifespan: As requested by Aqua.writer.rain
As I do take requests, Aqua.writer.rain requested the following lifespan:
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published May 26, 2012
And can be found here: http://bit.ly/M1yElY
| Baby | 2 |
| Toddler | 2 |
| Child | 2 |
| Teen | 2 |
| Adult | 7 |
| Elder | 2 |
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published May 26, 2012
And can be found here: http://bit.ly/M1yElY
zondag 25 maart 2012
New lifespan: As requested by Zaligelover
As I do take requests, zaligelover requested the following lifespan:
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published April 1, 2012
And can be found here:
| Baby | 2 |
| Toddler | 4 |
| Child | 8 |
| Teen | 8 |
| Adult | 35 |
| Elder | 10 |
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published April 1, 2012
And can be found here:
dinsdag 20 maart 2012
New lifespan and Universityspan: As requested by Libertina Grimm
As I do take requests, Libertina Grimm requested the following lifespan:
| Baby | 24 |
| Toddler | 48 |
| Child | 72 |
| Teen | 72 |
| Adult | 516 |
| Elder | 360 |
| University | 145 hours |
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 24, 2012
And can be found here: http://bit.ly/GGDsYl
vrijdag 16 maart 2012
New lifespan: As requested by melaniecox
As I do take requests, melaniecox requested the following lifespan:
| Baby | 12 |
| Toddler | 36 |
| Child | 96 |
| Teen | 72 |
| Adult | 468 |
| Elder | 360 |
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 19, 2012
And can be found here: http://bit.ly/zXxWrE
donderdag 15 maart 2012
New lifespan and petslifespan: As requested by aennehj
As I do take requests, aennehj requested the following lifespan:
| Baby | 12 |
| Toddler | 12 |
| Child | 12 |
| Teen | 12 |
| Adult | 96 |
| Elder | 24 |
| Kitten/puppy | 12 |
| Adult animal | 60 |
| Elder animal | 24 |
If you also have a request please go here: http://bit.ly/p9ymWC
The creation will be/was published March 21, 2012
And can be found here: http://bit.ly/GGbHVS
zondag 24 juli 2011
New project: Project Realistic Ages
This project grew over the past year. The mods were uploaded on MTS 'cause it wasn't possible (or I didn't know how) to upload them on TSR.
Lately it really bugged me it wasn't possible to upload the mods in one thread on MTS (I couldn't do this before as the project grew over the past year and I didn't plan at first to make so many mods for it). All the mods in one thread was really necessary as with all the requests I received too to change the mods.
So now I discovered how to upload mods on TSR. And I did. So the overview is there yey! But now I don't know what to do with the mods on MTS. There's still no overview there. So I might change those threads gradually.
Here's the complete project: http://bit.ly/oMmYKi
Here's all information you need about the project: http://bit.ly/nLy5C9
Any questions? Please, ask! It might help us both and other simmers.
Lately it really bugged me it wasn't possible to upload the mods in one thread on MTS (I couldn't do this before as the project grew over the past year and I didn't plan at first to make so many mods for it). All the mods in one thread was really necessary as with all the requests I received too to change the mods.
So now I discovered how to upload mods on TSR. And I did. So the overview is there yey! But now I don't know what to do with the mods on MTS. There's still no overview there. So I might change those threads gradually.
Here's the complete project: http://bit.ly/oMmYKi
Here's all information you need about the project: http://bit.ly/nLy5C9
Any questions? Please, ask! It might help us both and other simmers.
woensdag 6 oktober 2010
Project Realistic Ages SIMS 3
In addition to the Project Realistic Ages for SIMS 2, I can now present the same (Base Game) age mod for Sims 3. All the ages Short to Epic are the same and as followed:
Attachment: RealisticAges by Tiake - lientebollemeis variant.zip Downloads:
Baby: 3 months = 3 days
Toddlers: 69 Days
Children: 84 Days
Teens: 72 Days
Toddlers: 69 Days
Children: 84 Days
Teens: 72 Days
Young adults: 184 Days
Adults: 368 Days
Total of baby to adult: 780 days/12 = 65 years
Adults: 368 Days
Total of baby to adult: 780 days/12 = 65 years
Elders have no days, but a chance to die tied to the short, epic, ect age span length. It is 40%, 30%, 20%, 10%, 5%. With short being the highest and epic the lowest.
My biggest thanks go to Tiake on MTS as he made this mod and gave me permission to put it on a website.
Additional credits:
Peter L Jones (maker of the package editor), Tiake (for making this and permission to repost to my heart's content)
Attachment: RealisticAges by Tiake - lientebollemeis variant.zip Downloads:
Labels:
Mod,
Project,
Project Realistic Ages 3,
The Sims 3,
Tiake
zondag 23 mei 2010
Other mods: Insiminator
There are 3 versions:
You can download all 3 versions on this site:
http://www.insimenator.org/index.php?PHPSESSID=3590e61e885eb1ee65bf4d8bfdf41a02&topic=100226.0
- DEST edition
- The Spawn... menu appears when you click the ground. You can buy the individual sections in buy mode - electronics - all.
- OBJ edition
- You can buy the individual sections in buy mode - electronics - all.
- SIM edition
- The Spawn... menu appears when you click on the sim. You can buy the individual sections in buy mode - electronics - all.
You can download all 3 versions on this site:
http://www.insimenator.org/index.php?PHPSESSID=3590e61e885eb1ee65bf4d8bfdf41a02&topic=100226.0
Abonneren op:
Posts (Atom)
Older creations
-
▼
2013
(108)
-
▼
juni
(10)
- New remake Sims 3 Late Night: Film - Superstar Actor
- New remake Sims 3 Late Night: Film - Distinguished...
- New remake Sims 3 Ambitions: Medical
- New remake Sims 3 Ambitions: Investigator
- New remake Sims 3 Ambitions: Ghosthunter
- New remake Sims 3 Ambitions: Firefighter
- New remake Sims 3 Ambitions: Fashion Stylist
- New remake Sims 3 Ambitions: Education
- New building: Day Dream 3322
- New remake Sims 3 Ambitions: Architecture
-
▼
juni
(10)


