Policy

Pagina's

IMPORTANT INFORMATION

Posts tonen met het label Only on S2I. Alle posts tonen
Posts tonen met het label Only on S2I. Alle posts tonen

maandag 3 juni 2013

New building: Day Dream 3322

DD3322 is one of the several houseplans from "amazingplans" I will use to make new houses.
This residential lot is based on this houseplan.
I only used the Base Game and Mansion and Garden.
So you will need Mansion and Garden to play this house.

Let me know if you don't have Mansion and Garden and I'll try to fix that problem for you!

Screenshots:
Unfurnished


Furnished

Expansion pack needed:
Mansion and Garden

Download:
Unfurnished:

Furnished:






Credits:
www.amazingplans.com


vrijdag 3 mei 2013

New building: Day Dream 2177

DD2177 is the first of the several houseplans from "amazingplans" I will use to make new houses.
This residential lot is based on this houseplan.
I only used the Base Game and Mansion and Garden.
So you will need Mansion and Garden to play this house.

Let me know if you don't have Mansion and Garden and I'll try to fix that problem for you!

Screenshots:
Unfurnished

Furnished

Expansion pack needed:
Mansion and Garden

Download:
Unfurnished:

Furnished:






Credits:
www.amazingplans.com


zaterdag 20 april 2013

New changes to career: Tattoo artist adding reward

Risuriepu requested the following:
Changes to Tattoo career: adding reward Fingerprinting scanner (outfit: everyday outfit).

Download:


Risuriepu made this request by filling out this form: http://bit.ly/p9ymWC

zondag 30 september 2012

New Conversion: Photography (requested)

Before you download this career, you need to download the Careers mod from Twallan here: 
Patch 1.31~1.36: The Careers - Phase Ten 
Patch 1.38: The Careers - Phase Eleven for this career to show up in-game! 
Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Photographer!
It was requested for Sims 2 by Maxine190899.
You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Maxine190899.

Here is the full information for the career for Sims 3. The career has 10 levels and is located at the Business and Journalism Offices. It has one custom tone, Take Photos of Coworkers, which builds the Photography skill. 

Screenshot




Career Levels
Photography Career ~ Love taking photos of anything and everything, from that vase of flowers in the hallway, to your best friend dancing drunkenly at the pub last night? Maybe you’ve even had aspirations to become a wedding photographer, or even simply to be paid for the time and effort involved in each photo. This is the career path for you!



Technical Stuff:
This career was made with patch 1.38 and should work with all lower patches. It requires the Base Game and World Adventures to work (since that was the expansion the Photography skill came with) and should work with any other combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)


Translating
Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>

<STR>Translate This Text</STR>

Do that for the entire file :)


Download
Career: http://sdrv.ms/QOK7pv
Translating: http://sdrv.ms/QCGxl6


Credit to:
Lientebollemeis, Maxine190899 and the creators of s3pe

zondag 26 augustus 2012

New Conversion: Teen Babysitter


Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Babysitter!

It was requested for Sims 2 by Superstar001.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Superstar001.


Here is the full information for the career for Sims 3. The career is located at the Hospital. It has one custom tone, Chat to Children, which builds the Charisma skill.

                                                    






Technical Stuff:

This career was made with patch 1.36 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :

Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)

Download:
Language: http://sdrv.ms/MRb1iT

Credit to:
Lientebollemeis, Superstar001 and the creators of s3pe

zondag 19 augustus 2012

New Conversion: Tattoo Artist (request)

Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Tattoo Artist!
It was requested for the Sims 2 by Anaiyia.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Anaiyia.


Here is the full information for the career for Sims 3. The career is located at the Day Spa and the focus is on Painting. It has two custom tones, Practise Tattooing, which builds the hidden Tattooing skill (if you have Ambitions installed) and Design Artwork, which builds the Painting skill. I don't know what will happen if you do not have Ambitions installed and use the Practise Tattooing tone.






Technical Stuff:

This career was made with patch 1.36 and should work with all lower patches. It requires only the base game to run (Although will require Ambitions for the first custom tone to work) and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)

Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)

Download:
Language: http://sdrv.ms/PnVnee

Credit to:
Lientebollemeis, Anaiyia and the creators of s3pe

zondag 12 augustus 2012

New Conversion: Broadcast Journalism (request)

Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Broadcast Journalism!

It was requested for the Sims 2 by Shout5.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Shout5.


Here is the full information for the career for Sims 3. The career is located at the Business and Journalism Building and the focus is on Charisma and Writing. It has two custom tones, Write Reports, which builds the Writing skill and Conduct Interviews, which builds the Charisma Skill. This career does have uniforms for levels 3-10.







  

Technical Stuff:

This career was made with patch 1.36 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)


Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)


Download
Career: http://sdrv.ms/MPdHyD
Language: http://sdrv.ms/MpZWF3

Credit to:
Lientebollemeis, Shout5 and the creators of s3pe

zondag 5 augustus 2012

New Conversion: Professional Ballerina (request) Update French 20121216

Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Professional Ballerina!
It was requested for the Sims 2 by VikiAREi.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and VikiAREi.


Here is the full information for the career for Sims 3. The career is located at the Theatre and the focus is on Athletic, with a bit of Charisma, Cooking and Painting. It has one custom tone, Warm Up, which builds the Athletic skill. 




 



Technical Stuff:

This career was made with patch 1.36 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)

Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)

Download:
Career: http://sdrv.ms/QCPmgO
Language: http://sdrv.ms/ORJsoH

Credit to:
Lientebollemeis, VikiAREi and the creators of s3pe

zondag 29 juli 2012

New Conversion: Novelist (request)


Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Novelist!
It was requested for the Sims 2 by Dawn_.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Dawn_.


Here is the full information for the career for Sims 3. The career is located at the Business and Journalism Office and the focus is on Writing. It has one custom tone, Draft Novel, which builds the Writing skill. 





Technical Stuff:

This career was made with patch 1.34 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)

Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)


Download:
Career: http://sdrv.ms/NVJ5VK
Language: http://sdrv.ms/QdioCf

Credit to:
Lientebollemeis, Dawn_ and the creators of s3pe

zondag 22 juli 2012

New Conversion: Psychologist (request)

Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Psychologist!
It was requested for the Sims 2 by Izziejelly.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Izziejelly.


Here is the full information for the career for Sims 3. The career is located at the Hospital and the focus is on Logic, Charisma and Athletic. It has one custom tone, Study Psychology, which builds the Logic skill. 








Technical Stuff:


This career was made with patch 1.34 and should work with all lower patches and patch 1.36. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)


Translating


Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.


<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>


Do that for the entire file :)


Download:
Career: http://sdrv.ms/NtZQdG
Language: http://sdrv.ms/Ma8wH3


Credit to:
Lientebollemeis, Izziejelly, the creators of s3pe

zondag 15 juli 2012

New Conversion: Teen Cheerleader

Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten (http://nraas.wikispaces.com/Careers+Phase+Ten) for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Cheerleader! http://www.modthesims.info/download.php?t=432191
It was requested for Sims 2 by Random IceCream.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Random IceCream.


Here is the full information for the career for Sims 3. The career is located at the Stadium and the focus is on Athletic. It has one custom tone, Practise Routine, which builds the Athletic skill. 




Technical Stuff:

This career was made with patch 1.34 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)

Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)

Download:
Career: http://sdrv.ms/Nhfr0i
Translate: http://sdrv.ms/LGYIlc

Credit to: Lientebollemeis, Random IceCream and the creators of s3pe