Policy

Pagina's

IMPORTANT INFORMATION

Posts tonen met het label Babysitter. Alle posts tonen
Posts tonen met het label Babysitter. Alle posts tonen

woensdag 26 september 2012

New teen career: Babysitter (requested)

As I do take requests,  Superstar001 requested the career Babysitter.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published Sep 26, 2012
And can be found here: http://bit.ly/TINsXP

 

zondag 26 augustus 2012

New Conversion: Teen Babysitter


Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Babysitter!

It was requested for Sims 2 by Superstar001.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Superstar001.


Here is the full information for the career for Sims 3. The career is located at the Hospital. It has one custom tone, Chat to Children, which builds the Charisma skill.

                                                    






Technical Stuff:

This career was made with patch 1.36 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :

Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)

Download:
Language: http://sdrv.ms/MRb1iT

Credit to:
Lientebollemeis, Superstar001 and the creators of s3pe

donderdag 26 juli 2012

New Dutch Teen career: Babysit - Oppasser (verzoekje)

Aangezien ik verzoekjes aanvaard, heeft siepiemischa16 gevraagd de tienercarrière Oppasser te maken.
Het werkt met gelijk welke combinatie van uitbreidingen en accessoirepakketten.
Het zal geen andere carrière overschrijven.
Er is geen uitbreiding nodig om deze carrière te doen werken.
Druk op de knop "Show more information" voor meer informatie.
Als je ook een verzoekje hebt, ga dan hier naartoe: http://bit.ly/p9ymWC

Download:
Carrière: http://sdrv.ms/NMdlH9