Policy

Pagina's

IMPORTANT INFORMATION

Posts tonen met het label Situation. Alle posts tonen
Posts tonen met het label Situation. Alle posts tonen

donderdag 31 januari 2013

New Situation: It's All Relative

Short situation:
A woman named Jenny is married to a man named Frank. She gets pregnant and about the same time, Frank cheats on his wife with her sister Rosa. Rosa gets pregnanct to. At that moment Rosa has a relationship with Franks brother Luc.
Frank and Jenny get a daughter named Bianca. Rosa gets a daughter Peggy. Luc thinks he's the father of Peggy.
Frank and Jenny divorce. Frank remarries Simonne and they get a son named Franky.
Franky turns out to be gay later in life.

What do you need to start:
Two brothers named Frank and Luc
Two sisters named Jenny and Rosa
A woman named Simonne


    Based on:  The Flemish soap "Thuis"

    zondag 25 november 2012

    New blog changes

    After being a bit out of posting, I decided to (try to) post every day, but not only about The Sims.
    There are many other things I love in life and I want them to share on this blog too.
    Don't worry, The Sims (downloads and requests) will stay the main topic of the blog, but there is just not enough to say about it to post every day and I want to keep this blog busy.

    So I have thought of the other things I can post about and here's a list (I love lists):
    You're of course free to let me know what you think of this... (comments are possible anonymous)
    Suggestions are always welcome!

    The Sims
    - New Ideas
    - New Downloads
    - New Situations
    - New Stories
    - New Family Trees
    - New Descriptions
    - New Links
    - New Conversions (The Sims 3)

    Pets
    - Simba °21/04/2011 and my cat since 29/06/2011
    - Phoebe °24/04/2012 and my dog since 05/10/2012
    - Kitties/Doggies in general

    Music
    - Elvis Presley °08/01/1935 - *16/08/1977. My favourite singer since 16/08/2002
    - Other remarkable events in the present (deaths, births,...)

    Film and entertainment
    - Friends (serie with Matthew Perry, Jennifer Aniston)
    - Harry Potter
    - Twilight
    - The Big Bang Theory

    Other
    - Scientific things like biorythm, the earth,...
    - Polls
    - Always pictures
    - New Day of My Life

    maandag 15 oktober 2012

    New Situation: Johnny B Good

    Situation:
    In the woods there is a cabin made of wood. There lives a poor countryboy named Johnny B. Good with his mama. He has never learned to read and write, but he good play a guitar just like ringing a bell.
    As a teenager and an adult he plays guitar in a band.

    What do you need:
    A mama with her son.
    The son has low grades at school
    The creativity skill of the boy has reached maximum points by the time he's a teenager.
    He is the bandleader in a group of friends (he plays guitar).

    To play in a band you need this EP:

    Based on:
    Song: Johnny B. Good - Chuck Berry



    maandag 1 oktober 2012

    New Situation: Little Sister

    Situation:
    A teenageboy is going steady with a teenagegirl. The girl has a little sister (child). When the couple goes on a date another teenageboy comes along. The girl falls for the other boy and leaves her boyfriend.
    The first teenageboy is left behind by himself. When the little sister becomes a teenager, she goes out with her older sister's ex-boyfriend (the boy who was left behind).

    What do you need:
    Two families with each a teenageboy.
    One family with a teenagegirl and a younger girl (child).

    Based on:
    Song: Little Sister - Elvis Presley