Policy

Pagina's

IMPORTANT INFORMATION

zaterdag 30 maart 2013

New bedding: c'est ta saison by dramatique

This is a new bedding made for all beds in The Sims 2 (including EP beds).
No EP required.


Screenshot:


Download:

If you have a request please go here: http://bit.ly/p9ymWC

Creator Notes
Please, do not re-upload or use for anything but in game play, I accept requests.

Credits
SimPe, http://bit.ly/qFDuaf, http://bit.ly/Z1YNKr

vrijdag 29 maart 2013

New remake Sims 1: Fashion

This is a remake of the known Maxis' (EA Games) career.
It's not available in The Sims 2 Base Game.

Icon:


Screenshot:


Download:



Show more information:

A lot of people asked to create this and finally I remade them all.
Here's an overview of all the remade careers (+ more information on how and why I made this).

I also accept requests full time!
If you have a request please go herebit.ly/p9ymWC

Credits:
All people who requested one or several of these careers
EA Games and Maxis
SimPE
This site without I couldn't create this (all information about careers SPOILER!)
http://bit.ly/OAqLlK
-- (I'm not responsible for changes on this site. If something is not the same as the careers I made that's because it has been changed in the meantime.)

IMPORTANT
I do NOT  take any credit for the levels, descriptions, promotional skills needed, etc. as they are just taken from the Maxis' careers. I tried my best with everything I could not supply from the Maxis career.

Please, don't upload these careers anywhere. If you want to share them, share by the button Twitter, Facebook,...
Or share this link anywhere: http://bit.ly/NcnSNW

donderdag 28 maart 2013

New Poll: Which creations

Which creations do you want me to make more?


  1. Bedding
  2. Careers
  3. Part-time careers
  4. Nails
  5. Postcards
  6. Majors
  7. Clothes (try out)
  8. Books
  9. Calenders
  10. Paintings
  11. Requests
  12. Other

Please, tell me your opinion in a comment so I can anticipate

dinsdag 26 maart 2013

Newsflash: Less uploading on MTS

A lot of requested careers (so me not writing the careerdescriptions just creating the file) unfortunatly responded into many rejections on MTS (NEVER on TSR). The high demanding instructions I wrote on the forms should be followed more carefully as they are based on the high demanding rules of MTS.

This is the PM I received today from the MTS Uploadmanager:


Hi lientebollemeis,

It has come to our attention that you have had 118 uploads approved, and 49 uploads rejected since we have begun tracking uploads. Continued rejections may result in upload restriction - that is, you may not be able to continue to upload if you keep getting rejected at such a high rate.

Thanks,
MTS2Staff



Therefor I won't upload any requests on MTS anymore. I'll upload them on my Skydrive (S2I) and TSR.
So if you're not a fan of TSR you can download at S2I.

You may always suggest other uploadsites!

New nail polish: Burberry Clone by Beklad

To be found under glasses.

This is a new nail polish with a pattern from colourlovers made with the mesh from Liana.


Screenshot:



Download:
TSR: (upcoming)
MTS: (moderation queue)

Mesh:
http://bit.ly/Y92skh



If you have a request please go here: http://bit.ly/p9ymWC

maandag 25 maart 2013

New nail polish: Blouse by peachymanaangel

To be found under glasses.

This is a new nail polish with a pattern from colourlovers made with the mesh from Liana.


Screenshot:



Download:
TSR: (upcoming)
MTS: (moderation queue)

Mesh:
http://bit.ly/Y92skh



If you have a request please go here: http://bit.ly/p9ymWC

zaterdag 23 maart 2013

New bedding: don't leaf qlaudia by Linsomnia

This is a new bedding made for all beds in The Sims 2 (including EP beds).
No EP required.


Screenshot:


Download:
S2I: http://sdrv.ms/121XeNy
MTS: (moderation queue)

If you have a request please go here: http://bit.ly/p9ymWC

Creator Notes
Please, do not re-upload or use for anything but in game play, I accept requests.

Credits
SimPe, http://bit.ly/qFDuaf, http://bit.ly/Z1YNKr

vrijdag 22 maart 2013

Newsflash: Kim De Gelder aka babykiller

I'm from Belgium, Dendermonde. I followed this trial quite closely. I even know some of the victims. I hope you understand I would like to share this:

P.S.: He's sentenced to life without parole.



Belgian 'Joker' guilty of child killings

A 24-YEAR-OLD child killer disguised as Batman villain The Joker has been found guilty of the murder of four people, including two infants, with a court in Belgium ruling out mental illness in its verdict.
Kim De Gelder was found to have been lucid - "not in a demonic state or mentally troubled" - by the jury in Ghent, the judge said live on Belgian television.
He was found guilty of killing two infants aged six and nine months and their 54-year-old carer in an attack on the Fable Land nursery in the town of Dendermonde in January 2009.
De Gelder entered the nursery with his hair dyed red and his face painted white with black around his eyes - like The Joker as played by late Australian actor Heath Ledger in the cult 2008 Batman movie, The Dark Knight.
He was also found guilty of murdering an elderly woman in a separate attack a week earlier.
After four hours of deliberations following the four-week trial, "the jury answered 'yes' to 54 questions" concerning his guilt, the senior judge said, with a "no" response to the final question concerning his mental state at the time.
De Gelder's sentence will be decided later, following fresh pleas and further deliberations by the jury and the three judges.
He risks life without parole, the heaviest sentence under Belgian law.
Last year, US youth James Holmes was accused of killing 12 people and wounding 58 in a cinema screening of a sequel to the Batman instalment.

Newsflash: Kim De Gelder aka babykiller

I'm from Belgium, Dendermonde. I followed this trial quite closely. I even know some of the victims. I hope you understand I would like to share this:

P.S.: He's sentenced to prison for life.


A BELGIAN court will hear how a then 20-year-old disguised himself as The Joker before going on a killing spree at a nursery four years ago.
Kim De Gelder, now aged 24, will be formally charged with killing two infants and their 54-year-old minder in an attack on Fable Land day care centre in the town of Dendermonde in 2009.
He will also be accused of murdering an elderly woman in a separate attack a week earlier, and be charged for attempted murder on 22 people, including 16 babies and toddlers at the creche.
The jury of eight men and four women will be told by the prosecution that after initial disagreements, psychiatric experts had deemed the accused could stand trial as he was "able to distinguish between good and evil" when the killings took place.
The charge-sheet shows how the then-unemployed 20-year-old, son of a nurse and of an inspector at the state water board, planned the shocking rampage.
At dawn on January 23 he dyed his hair red and painted his face white with black around his eyes like The Joker in the Batman movie The Dark Knight.
Last year, US youth James Holmes was accused of killing 12 people and wounding 58 in a cinema screening the sequel of the film.
Once disguised, De Gelder filled a bag with knives and an axe and cycled to the nursery in mid-morning where he said to 54-year-old minder Marita Blindeman: "I have a question, can you help?"
"Without warning," says the charge-sheet, "the young man began to knife her".
She did not survive.
In the nursery he then went for six-month Corneel and nine-month Leon.
And then, in a bloody rampage that lasted 15 minutes, attacked the remaining children and adults before making off on his bike.
Police said he had planned to attack two more nurseries, a police academy, and even the king but he was picked up an hour later by an officer.

Source: http://www.dailytelegraph.com.au/news/world/belgium-joker-on-trial-for-killing-spree/story-fnddckzi-1226583897920

New remake Sims 1: Entertainment

This is a remake of the known Maxis' (EA Games) career.
It's not available in The Sims 2 Base Game.

Icon:


Screenshot:


Download:



Show more information:

A lot of people asked to create this and finally I remade them all.
Here's an overview of all the remade careers (+ more information on how and why I made this).

I also accept requests full time!
If you have a request please go herebit.ly/p9ymWC

Credits:
All people who requested one or several of these careers
EA Games and Maxis
SimPE
This site without I couldn't create this (all information about careers SPOILER!)
http://bit.ly/OAqLlK
-- (I'm not responsible for changes on this site. If something is not the same as the careers I made that's because it has been changed in the meantime.)

IMPORTANT
I do NOT  take any credit for the levels, descriptions, promotional skills needed, etc. as they are just taken from the Maxis' careers. I tried my best with everything I could not supply from the Maxis career.

Please, don't upload these careers anywhere. If you want to share them, share by the button Twitter, Facebook,...
Or share this link anywhere: http://bit.ly/NcnSNW

dinsdag 19 maart 2013

New remake Sims 1: Journalism

This is a remake of the known Maxis' (EA Games) career.
It's not available in The Sims 2 Base Game.

Icon:

Screenshot:



Download:


Show more information:

A lot of people asked to create this and finally I remade them all.
Here's an overview of all the remade careers (+ more information on how and why I made this).

I also accept requests full time!
If you have a request please go herebit.ly/p9ymWC

Credits:
All people who requested one or several of these careers
EA Games and Maxis
SimPE
This site without I couldn't create this (all information about careers SPOILER!)
http://bit.ly/OAqLlK
-- (I'm not responsible for changes on this site. If something is not the same as the careers I made that's because it has been changed in the meantime.)

IMPORTANT
I do NOT  take any credit for the levels, descriptions, promotional skills needed, etc. as they are just taken from the Maxis' careers. I tried my best with everything I could not supply from the Maxis career.

Please, don't upload these careers anywhere. If you want to share them, share by the button Twitter, Facebook,...
Or share this link anywhere: http://bit.ly/NcnSNW


maandag 18 maart 2013

New remake Sims 1: Hacker

This is a remake of the known Maxis' (EA Games) career.
It's not available in The Sims 2 Base Game.

Icon:



Screenshot:



Download:


Show more information:

A lot of people asked to create this and finally I remade them all.
Here's an overview of all the remade careers (+ more information on how and why I made this).

I also accept requests full time!
If you have a request please go herebit.ly/p9ymWC

Credits:
All people who requested one or several of these careers
EA Games and Maxis
SimPE
This site without I couldn't create this (all information about careers SPOILER!)
http://bit.ly/OAqLlK
-- (I'm not responsible for changes on this site. If something is not the same as the careers I made that's because it has been changed in the meantime.)

IMPORTANT
I do NOT  take any credit for the levels, descriptions, promotional skills needed, etc. as they are just taken from the Maxis' careers. I tried my best with everything I could not supply from the Maxis career.

Please, don't upload these careers anywhere. If you want to share them, share by the button Twitter, Facebook,...
Or share this link anywhere: http://bit.ly/NcnSNW

zondag 17 maart 2013

New nail polish: Belleville afternoon

To be found under glasses.

This is a new nail polish with a pattern from colourlovers made with the mesh from Liana.


Screenshot:


Download:

Mesh:
http://bit.ly/Y92skh



If you have a request please go here: http://bit.ly/p9ymWC

zaterdag 16 maart 2013

New bedding: Darius' Dare by faded jeans

This is a new bedding made for all beds in The Sims 2 (including EP beds).
No EP required.


Screenshot:


Download:
S2I: http://sdrv.ms/WXpNYN
MTS: (moderation queue)

If you have a request please go here: http://bit.ly/p9ymWC

Creator Notes
Please, do not re-upload or use for anything but in game play, I accept requests.

Credits
SimPe, http://bit.ly/qFDuaf, http://bit.ly/Z1YNKr

vrijdag 15 maart 2013

New remake Sims 1: Education

This is a remake of the known Maxis' (EA Games) career.
It's not available in The Sims 2 Base Game.

Icon:


Screenshot:


Download:


Show more information:

A lot of people asked to create this and finally I remade them all.
Here's an overview of all the remade careers (+ more information on how and why I made this).

I also accept requests full time!
If you have a request please go herebit.ly/p9ymWC

Credits:
All people who requested one or several of these careers
EA Games and Maxis
SimPE
This site without I couldn't create this (all information about careers SPOILER!)
http://bit.ly/OAqLlK
-- (I'm not responsible for changes on this site. If something is not the same as the careers I made that's because it has been changed in the meantime.)

IMPORTANT
I do NOT  take any credit for the levels, descriptions, promotional skills needed, etc. as they are just taken from the Maxis' careers. I tried my best with everything I could not supply from the Maxis career.

Please, don't upload these careers anywhere. If you want to share them, share by the button Twitter, Facebook,...
Or share this link anywhere: http://bit.ly/NcnSNW

donderdag 14 maart 2013

New mesh: Nails

This is a mesh for nails.
You need this for every nailrecolor to work. (soon on S2I)

Download:
http://sdrv.ms/10s06iR



Credit:
http://www.lianasims2.net

woensdag 13 maart 2013

In memoriam: Bus disaster Switzerland

Today exactly one year ago.
As I'm from Belgium (Flanders), I felt like sharing this:
http://en.wikipedia.org/wiki/Sierre_coach_crash

dinsdag 12 maart 2013

New bedding: MeltNeapolitanTartan by retsof

This is a new bedding made for all beds in The Sims 2 (including EP beds).
No EP required.


Screenshot:


Download:
MTS: (moderation queue)

If you have a request please go here: http://bit.ly/p9ymWC

Creator Notes
Please, do not re-upload or use for anything but in game play, I accept requests.

Credits
SimPe, http://bit.ly/qFDuaf, http://bit.ly/Z1YNKr

maandag 11 maart 2013

New insiminator option explained: User control


Where do I download the insiminator?
- You can download it here: Downloads
- The Insiminator is compatible with ALL expansions.
Where do I find it in game?
Elektronics ---> All

User control


For this adjustor there are following options:




  • Active Sim Menu
    • Add an option to your sim. Click on the active sim to see the new option.
  • Target Sim Menu
    • Add an option to another sim. Click that sim to see this option.
  • Summon Method
    • Summon a sim to your lot.
  • Buy Mode
    • Change the buy mode (advisable not to do so).


zondag 10 maart 2013

New part-time career: NCIS Adult Education

The original career is found here (for more information): http://bit.ly/XWG4vg

These are the (35) part-time careers for Adult Education NCIS.
More information about part-time careers is found here: http://bit.ly/15Zaqmv

All these careers have a unique GUID so you can have them all in your game at once.

You need to download the careerreward in order for it to work.

Icon:

Screenshot:


Download:
S2I: http://sdrv.ms/15pUGI6 (reward also available here)
MTS: (moderation queue)

Read this!
FAQ: The careers don't show up in my game

zaterdag 9 maart 2013

New bedding: Coco Pistachio by biancx

This is a new bedding made for all beds in The Sims 2 (including EP beds).
No EP required.


Screenshot:


Download:
MTS: (moderation queue)

If you have a request please go here: http://bit.ly/p9ymWC

Creator Notes
Please, do not re-upload or use for anything but in game play, I accept requests.

Credits
SimPe, http://bit.ly/fSnciT, http://bit.ly/Z1YNKr

vrijdag 8 maart 2013

New remake Sims 1: Circus

This is a remake of the known Maxis' (EA Games) career.
It's not available in The Sims 2 Base Game.

Icon:


Screenshot:


Download:


Show more information:

A lot of people asked to create this and finally I remade them all.
Here's an overview of all the remade careers (+ more information on how and why I made this).

I also accept requests full time!
If you have a request please go herebit.ly/p9ymWC

Credits:
All people who requested one or several of these careers
EA Games and Maxis
SimPE
This site without I couldn't create this (all information about careers SPOILER!)
http://bit.ly/OAqLlK
-- (I'm not responsible for changes on this site. If something is not the same as the careers I made that's because it has been changed in the meantime.)

IMPORTANT
I do NOT  take any credit for the levels, descriptions, promotional skills needed, etc. as they are just taken from the Maxis' careers. I tried my best with everything I could not supply from the Maxis career.

Please, don't upload these careers anywhere. If you want to share them, share by the button Twitter, Facebook,...
Or share this link anywhere: http://bit.ly/NcnSNW

dinsdag 5 maart 2013

New bedding: muestra 2 by Karelia

This is a new bedding made for all beds in The Sims 2 (including EP beds).
No EP required.


Screenshot:


Download:
MTS: (moderation queue)

If you have a request please go here: http://bit.ly/p9ymWC

Creator Notes
Please, do not re-upload or use for anything but in game play, I accept requests.

Credits
SimPe, http://bit.ly/
fSnciT, http://bit.ly/Z1YNKr

zondag 3 maart 2013

New teen career: Student Council (requested)

As I do take requests, rosedreamer101 requested the teen career Student Council.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC

Icon:


Screenshot:





Download:
MTS: (moderation queue)

I also accept requests full time!
If you have a request please go herebit.ly/p9ymWC

Please, don't upload this career anywhere. If you want to share it, share by the button Twitter, Facebook,...