Policy

Pagina's

IMPORTANT INFORMATION

maandag 23 augustus 2010

MESH necklaces on MTS & TSR

I uploaded some necklaces  on TSR. In order for those necklaces to work, you need a MESH.That can be found here.
With a lot of thanks to Dr_Pixel on MTS. 
The necklaces Alphabet Black Arial (for females) can be found here: http://www.thesimsresource.com/downloads/1002898


Attachment Female MESH: MESH_DPXLalphaEaringsNecklace080405.zip Downloads: 2626
Attachment Male MESH: MESH_DPXL122705MaleNecklace.zip Downloads: 1145

1 opmerking:

  1. Hi Lientebollemeis :)

    I just saw your alphabet necklaces upon the Sims 2 Resource site and that's why I'm here to download the mesh, as I'm sure my "M" will look wonderful on my Sims 2 neck.

    Thank you for your work,

    Marilyn (badthing)

    BeantwoordenVerwijderen