Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Babysitter!
It was requested for Sims 2 by Superstar001.
You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Superstar001.
Here is the full information for the career for Sims 3. The career is located at the Hospital. It has one custom tone, Chat to Children, which builds the Charisma skill.

Technical Stuff:
This career was made with patch 1.36 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :
Translating
Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.
<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>
Do that for the entire file :)
Download:
Do that for the entire file :)
Download:
Career: http://sdrv.ms/TZYOc2
Lientebollemeis, Superstar001 and the creators of s3pe
Update:
BeantwoordenVerwijderenPhase Eleven works too. Phase Ten is for those with patches 1.31 to 1.36. Anyone with 1.38 needs Phase Eleven and the careers work with that too.
All the careers are compatible with Patch 1.38 and Supernatural
Thanks for these, can you convert all of the Sims 1 and 2 careers that Lientebollemeis made too please?
BeantwoordenVerwijderen