Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten for this career to show up in-game!
Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Psychologist!
It was requested for the Sims 2 by Izziejelly.
You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Izziejelly.
Here is the full information for the career for Sims 3. The career is located at the Hospital and the focus is on Logic, Charisma and Athletic. It has one custom tone, Study Psychology, which builds the Logic skill.
Technical Stuff:
This career was made with patch 1.34 and should work with all lower patches and patch 1.36. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)
Translating
Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.
<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>
Do that for the entire file :)
Download:
Career: http://sdrv.ms/NtZQdG
Language: http://sdrv.ms/Ma8wH3
Credit to:
Lientebollemeis, Izziejelly, the creators of s3pe
IMPORTANT INFORMATION
zondag 22 juli 2012
New Conversion: Psychologist (request)
Labels:
Adult career,
career,
Conversion,
MissyHissy,
Only on S2I,
Polish,
Psychologist,
The Sims 3
Abonneren op:
Reacties posten (Atom)
Older creations
-
▼
2012
(140)
-
▼
juli
(16)
- New career: Samurai Warrior (requested)
- New Conversion: Novelist (request)
- New career: Mafia (requested)
- New Dutch Teen career: Babysit - Oppasser (verzoekje)
- New career: Genealogy (requested)
- New Conversion: Psychologist (request)
- New FAQ: The lifespan doesn't work
- New career: Jack Of All Trades (requested)
- New FAQ: The careers don't show up in my game
- New Conversion: Teen Cheerleader
- New career: Grilled Cheese (requested)
- New Conversion: Wedding Planner (request)
- New Conversion: Cosmetology (requested)
- IMPORTANT: Accepting requests FULL TIME again
- New career: Flight career (requested)
- New Conversion: Veterinarian (request) + Polish
-
▼
juli
(16)

Update:
BeantwoordenVerwijderenPhase Eleven works too. Phase Ten is for those with patches 1.31 to 1.36. Anyone with 1.38 needs Phase Eleven and the careers work with that too.
All the careers are compatible with Patch 1.38 and Supernatural