Policy

Pagina's

IMPORTANT INFORMATION

vrijdag 28 september 2012

New insiminator option explained: Aspiration adjustor


Where do I download the insiminator?
- You can download it here: Downloads
- The Insiminator is compatible with ALL expansions.
Where do I find it in game?
Elektronics ---> All

Aspiration adjustor


For this adjustor there are following options:




  • My Aspiration Score
    • Change the aspiration score.
  • Group Aspiration Score
    • Change the aspiration score of all sims.
  • Set Aspiration Score
    • Decide which level your aspiration should be.
  • Add Aspiration Points
    • Add aspiration points to buy aspiration awards.
  • Change Aspiration
    • Change the aspiration, turn ons and turn offs of your sim.
  • Randomize
    • The game chooses the aspiration for you.
  • Aspiration Score Decay
    • I don't know what this does.
  • Aspiration Score Lock
    • The aspiration score of your sim doesn't change anymore.
  • Lifetime Platinum
    • Have lifetime Platinum like forfilling the lifetime wish.
  • Lifetime Wants
    • Lifetime wish/want is changed randomly.
  • Wants Panel
    • Add a lock or slot to the wants and fear panel

Geen opmerkingen:

Een reactie posten