Policy

Pagina's

IMPORTANT INFORMATION

woensdag 13 februari 2013

New insiminator option explained: Education adjustor


Where do I download the insiminator?
- You can download it here: Downloads
- The Insiminator is compatible with ALL expansions.
Where do I find it in game?
Elektronics ---> All

Education adjustor


For this adjustor there are following options:


Use this best with a teen or child as an active sim.
This adjustor is very useful with University.


  • Secret Society (Option for (young) adults)
    • Be added to a Secret Society in University.
  • Influence Points
    • Change the level of the influence points.
  • Influence Level
    • Change the influence level.
  • Class Performance
    • Change the schoolmarks
  • School Type
    • Private school
    • Public school
    • No school
    • (Other downloaded schooltypes)




Geen opmerkingen:

Een reactie posten