Policy

Pagina's

IMPORTANT INFORMATION

dinsdag 31 januari 2012

New teen career: Fame (requested)

As I do take requests, Poller12 requested the career Fame.
This is a teen career. It's EP compatible and has its own GUID (no overwrite).
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published Feb 4, 2012
And can be found here: http://bit.ly/A836Vz


donderdag 26 januari 2012

New career: Hip-Hop Music (requested)

As I do take requests, Zoebot requested the career Hip-Hop Music.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
EP Free Time is required.
This career has chancecards for levels 2,3,7 and 8
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published Feb 1, 2012
And can be found here: http://bit.ly/xJ8hUd

 

donderdag 19 januari 2012

New Teen & Adult career: Professional Ballerina (requested)

As I do take requests, VikiAREi requested the careers Ballerina for teens and adults.
It's EP compatible and has its own GUID (no overwrite). No EP's required.
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published Jan 23, 2012
And can be found here: http://bit.ly/AdxJwv

Update 2013-02-23
Mona1863 translated the teen career into German. Thanks!


zaterdag 26 november 2011

Taking a break for unknown amount of time

Hi,

I don't have time for The Sims 2, (new) requests and all for some time. I will do the current requests, but I won't put a guideline on them so I can do them on my own time.

On a lot of places you'll find I take requests. I do, but I'm on a temporary break right now. So remember your requests till I have time to accept them again.

It will be on my Twitter and Facebook when I have some more time to take requests again, but now life is just too busy for that.

Thanks for understanding and your patience.

Greets,
Lien

dinsdag 27 september 2011

Website's move to new server

By using www.sims2idee.tk as main address not many links need to be changed. There are only 5 links which really need attention for moving to the new server.
These are the NEW links:

  1. OVERVIEW REQUEST: http://bit.ly/rfioYl
  2. EXPLANATION OF THE OVERVIEW: http://bit.ly/qCwMu1
  3. FAQ SIMS2: http://bit.ly/rteCb2
  4. INSIMINATOR: http://bit.ly/p1qHC1
  5. UPDATES: http://bit.ly/mQptui

Sorry for any inconvinience this servermoving might have caused.

zondag 24 juli 2011

New Tutorial: Your own movies/TV show on Sims TV


First some important things:
1. The movie shouldn't be too long. (It's smaller (in MB) and takes less time to download)
2. YouTube is the best for short fun movies.
3. It should ALWAYS be AVI!
4. ALWAYS 128x128. Otherwise it will not look good on Sims TV.
5. ALWAYS 15 frames/seconde. It may be more, but then the file will be bigger.
6. You may remove or replace the files with extension .movie (default movies)
8. Channels came with Base Game, University, Seasons and Free Time.

Now the tutorial
First you decide which movie you want for which channel. I choose the trailer of the first Harry Potter movie for the channel Horrormovie Werewolf (came with Free Time) which I found on YouTube. I choose a trailer and not the whole movie as the movie should be short.

IMPORTANT: You have to watch the whole movie (trailer in this case) on YouTube first so it's fully loaded.

If you know which movie you want (YouTube or a file on your computer) go to this site:
http://video.online-convert.com/convert-to-avi



This is what you need to fill in:
Bestand kiezen: Choose the file on your computer.
OF enter URL: Give the URL copied from YouTube
Change Size: 128x128 is ideal.
Change frame rate: 15 frames per second as it should be
Cut video: If the movie you chose is too long you can make it smaller by filling out the start- and endminute. The first 00 is hour. The second 00 are minutes and the third 00 are seconds.
Convert file: Check everything and then press Convert file.

Don't change anything else if you don't know what you're doing!

The longer the movie, the longer it will take to download.

Now you get this screen:



After a short while you get this screen:



You can fill out your e-mail and press Submit address.
If you do that, you may shut the window and even shut down your computer. You'll get an e-mail when the file is ready to download.
If you don't want to give your e-mail, you'll have to wait until the window Save As shows so you can save the file.

Where you need to place the file depends on which channel you chose (see overview at the bottom).

These are the possible paths:

Base Game: C:\Program Files\EA GAMES\The Sims 2\Base\TSData\Res\Movies\Broadcast
University: C:\Program Files\EA GAMES\The Sims 2 University\TSData\Res\Movies\Broadcast
Seasons: C:\Program Files\EA GAMES\The Sims 2 Seasons\TSData\Res\Movies\Broadcast
Free Time: C:\Program Files\EA GAMES\The Sims 2 Free Time\TSData\Res\Movies\Broadcast

Base Game: TvChildren
Base Game: TvFood
Base Game: TvSBN
Base Game: TvMusic
Base Game: Commercials
Base Game: TvWorkout

Univeristy: TvSports

EP Seasons: The Weather Forecast
- Winter: TV_Weather_Winter
- Summer: TV_Weather_Summer
- Spring: TV_Weather_Spring
- Autumn: TV_Weather_Fall

Free Time for all movies: Watch movie... Horor...
- TVMovie_Werewolf
-- Harry Potter 1 (trailer)
- TVMovie_BWCat

Action
- TVMovie_Weather
- TVMovie_Fetch

Childrenmovie...
- TVMovie_Fairies
- TV_FamilyFun

Comedy...
- Mime-kat: TVMovie_MimeCat
- Kip: TVMovie_Checkers

Drama...
- TVMovie_PoolTable
- TVMovie_BubbleBath

The principal is the same for having other movies for the different games. You'll just have to save the AVI-file in the folder Games instead of Broadcast.
I haven't tried this!

I'm not responsible for any crashes, explosions or whatever to your game and computer!

Original tutorial written by Lientebollemeis (me) is found here: http://bit.ly/fJb8MB

New project: Project Realistic Ages

This project grew over the past year. The mods were uploaded on MTS 'cause it wasn't possible (or I didn't know how) to upload them on TSR.
Lately it really bugged me it wasn't possible to upload the mods in one thread on MTS (I couldn't do this before as the project grew over the past year and I didn't plan at first to make so many mods for it). All the mods in one thread was really necessary as with all the requests I received too to change the mods.
So now I discovered how to upload mods on TSR. And I did. So the overview is there yey! But now I don't know what to do with the mods on MTS. There's still no overview there. So I might change those threads gradually.

Here's the complete project: http://bit.ly/oMmYKi
Here's all information you need about the project: http://bit.ly/nLy5C9

Any questions? Please, ask! It might help us both and other simmers.