Policy

Pagina's

IMPORTANT INFORMATION

zaterdag 7 juli 2012

IMPORTANT: Accepting requests FULL TIME again


If you have a request, click on the right link and follow the instructions on that page.
http://bit.ly/p9ymWC


MOST IMPORTANT: Accepting a request from you once does NOT mean your next request is automaticaly  accepted!

I accept requests full time again, but on a few conditions.

1. Only requests received by the requestforms are valid.

2. The instructions need to be followed much more strictly.
- This means that I will reject requests much faster!
- You'll have to fill out the form over and over and over again till all instructions were followed correctly. I'm very strict with this!

2.1. Spelling and grammar is the biggest reason at the moment for rejection.
- Be sure to use a good (online/offline) spelling- and grammarchecker.
- This counts for ALL languages.

3. My expectations of the quality of the request is much higher (see instructions)
- This means if I don't like the request, I won't create it.
- Don't use anything for requesting that was made by someone else. If I see you did that I'm not accepting requests from you anymore in future!

4. Some appreciation, respect and understanding
- Because I put a lot of time and effort in every creation, I only accept requests that I like.
- I have the right to reject your request for any reason.
- I take my time to create the request, no rush. I decide when to upload it and where.


5. There are a few kind of creations I won't do by request.
- Bodyshop creations
- Houses
- Sims

6. I only create for Sims 2. I don't create for Sims 3. No use asking.

If you don't agree then don't request.

vrijdag 6 juli 2012

New career: Flight career (requested)

As I do take requests, Viktorflogi requested the career Flight career.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published July 11, 2012
And can be found here: http://bit.ly/NldW0M

 

zondag 1 juli 2012

New Conversion: Veterinarian (request) + Polish

Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten (http://nraas.wikispaces.com/Careers+Phase+Ten) for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Veterinarian! http://www.modthesims.info/download.php?t=397773 
It was requested for the Sims 2 by Lizzietrots.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Lizzietrots.


Here is the full information for the career for Sims 3. The career is located at the Hospital and the focus is on Logic, Athletic, Charisma and Handiness. It has one custom tone, Observe Veterinary Surroundings, which builds the logic skill. It also has custom uniforms for levels 2, 4, 5, 7, 8, 9 and 10.



Technical Stuff:


This career was made with patch 1.34 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)


Translating


Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.


<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>


Do that for the entire file :)


Download here:
Careerhttp://sdrv.ms/KMs2VJ
Translate: http://sdrv.ms/MthjoQ


Credit to:
Lientebollemeis, Lizzietrots, the creators of s3pe and SimOutfitter, ShimiChibi for Polish translation

vrijdag 29 juni 2012

New career: Estate Agent (requested)

As I do take requests, cheesegodtony requested the career Estate Agent.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published July 4, 2012
And can be found here: http://bit.ly/MfwsKT

 

zondag 24 juni 2012

New FAQ: Can you make Sims 3 careers?


Sorry to say that I'm not able to create anything for Sims 3. Not only is my computer to old and to slow to create and test Sims 3 creations, but I also don't have the modding talent to create for it.


So I asked some Sims 3 career creators to convert The Sims 2 careers I made to Sims 3. And I'm very happy some of them are busy doing it.


The result of this (so the Sims 3 careers) will only be found here on my blog.
They won't be published anywhere else.


vrijdag 22 juni 2012

New career: Cricketer (requested)

As I do take requests, AmyyJoy requested the career Cricketer.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published June 27, 2012
And can be found here: http://bit.ly/LmuEQ1

 

zaterdag 16 juni 2012

New postcards (2): It's a boy/girl (requested)

These are 2 New Birth cards for your sims to send to anyone they know in the neighbourhood. The receiver will get a small boost to the relationship with the sender when the recipient looks at the card.
These were requested by KatlynnMcCain

You will need the postalsystem of MogHughson which you can find here. That thread also contains all information about how to use these cards. You can even make your cards yourself with different categories.

The pictures were found here: 
http://bit.ly/K6oLVe
http://bit.ly/ITWdvO

The text on the cards was found here:
www.poemsource.com/baby-poems.html

Downloads:
It's a girl: http://sdrv.ms/LXqQU5