Policy

Pagina's

IMPORTANT INFORMATION

zondag 15 juli 2012

New Conversion: Teen Cheerleader

Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten (http://nraas.wikispaces.com/Careers+Phase+Ten) for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Cheerleader! http://www.modthesims.info/download.php?t=432191
It was requested for Sims 2 by Random IceCream.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Random IceCream.


Here is the full information for the career for Sims 3. The career is located at the Stadium and the focus is on Athletic. It has one custom tone, Practise Routine, which builds the Athletic skill. 




Technical Stuff:

This career was made with patch 1.34 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)

Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)

Download:
Career: http://sdrv.ms/Nhfr0i
Translate: http://sdrv.ms/LGYIlc

Credit to: Lientebollemeis, Random IceCream and the creators of s3pe

vrijdag 13 juli 2012

New career: Grilled Cheese (requested)

As I do take requests,  Modular Homes requested the career Grilled Cheese.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published July 18, 2012
And can be found here: http://bit.ly/PRJJty

 

dinsdag 10 juli 2012

New Conversion: Wedding Planner (request)


Before you download this career you need to download the Careers mod from Twallan here: Careers so that the career shows up in-game!


Lientebollemeis asked me to convert some of her sims 2 careers and I was very happy to do that! So this is one of her careers, Wedding Planner! It was requested for the sims 2 from SonicBoom12.

You find here a conversion of the career for sims 3. So any additional texts, infos etc. are by myself, but the origional idea is from Lientebollemeis and SonicBoom12.

Here is the full information for the career. The career is located at the business rabbithole and the focus is on design (painting), cooking and charisma. It has custom tones, but remember you need to have one point of each skill so that the custom tones show up!






The levels
(if you want to be surprised during gameplay I suggest not reading this text)



Download:
Career: http://sdrv.ms/NJHPqL

Technical stuff:
My patch level is 1.34.27.016002, I have only the base game installed.

Additional Credits:
Thanks to Lientebollemeis and Sonicboom12 for the original sims 2 career. And thanks to Twallan for his career mod and the creators of s3pe.

zondag 8 juli 2012

New Conversion: Cosmetology (requested)


Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten (http://nraas.wikispaces.com/Careers+Phase+Ten) for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Cosmetology! http://www.modthesims.info/download.php?t=415287 
It was requested for the Sims 2 by Fatal_syn.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Fatal_syn.


Here is the full information for the career for Sims 3. The career is located at the Day Spa and the focus is on Logic and Charisma. It has one custom tone, Chat to Customers, which builds the Charisma skill. 



Technical Stuff:

This career was made with patch 1.34 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)

Translating

Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.

<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>

Do that for the entire file :)

Download:
Career: http://sdrv.ms/LD6igE
Translate: http://sdrv.ms/OCiMbN

Credit to:
Lientebollemeis, Fatal_syn and the creators of s3pe

zaterdag 7 juli 2012

IMPORTANT: Accepting requests FULL TIME again


If you have a request, click on the right link and follow the instructions on that page.
http://bit.ly/p9ymWC


MOST IMPORTANT: Accepting a request from you once does NOT mean your next request is automaticaly  accepted!

I accept requests full time again, but on a few conditions.

1. Only requests received by the requestforms are valid.

2. The instructions need to be followed much more strictly.
- This means that I will reject requests much faster!
- You'll have to fill out the form over and over and over again till all instructions were followed correctly. I'm very strict with this!

2.1. Spelling and grammar is the biggest reason at the moment for rejection.
- Be sure to use a good (online/offline) spelling- and grammarchecker.
- This counts for ALL languages.

3. My expectations of the quality of the request is much higher (see instructions)
- This means if I don't like the request, I won't create it.
- Don't use anything for requesting that was made by someone else. If I see you did that I'm not accepting requests from you anymore in future!

4. Some appreciation, respect and understanding
- Because I put a lot of time and effort in every creation, I only accept requests that I like.
- I have the right to reject your request for any reason.
- I take my time to create the request, no rush. I decide when to upload it and where.


5. There are a few kind of creations I won't do by request.
- Bodyshop creations
- Houses
- Sims

6. I only create for Sims 2. I don't create for Sims 3. No use asking.

If you don't agree then don't request.

vrijdag 6 juli 2012

New career: Flight career (requested)

As I do take requests, Viktorflogi requested the career Flight career.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published July 11, 2012
And can be found here: http://bit.ly/NldW0M

 

zondag 1 juli 2012

New Conversion: Veterinarian (request) + Polish

Before you download this career, you need to download the Careers mod from Twallan here: The Careers - Phase Ten (http://nraas.wikispaces.com/Careers+Phase+Ten) for this career to show up in-game!


Lientebollemeis asked me to convert some of her Sims 2 careers and I was very happy to do that! So this is one of her careers, Veterinarian! http://www.modthesims.info/download.php?t=397773 
It was requested for the Sims 2 by Lizzietrots.


You find here a conversion for the Sims 3. So any additional texts, info etc are by me, but the original idea is from Lientebollemeis and Lizzietrots.


Here is the full information for the career for Sims 3. The career is located at the Hospital and the focus is on Logic, Athletic, Charisma and Handiness. It has one custom tone, Observe Veterinary Surroundings, which builds the logic skill. It also has custom uniforms for levels 2, 4, 5, 7, 8, 9 and 10.



Technical Stuff:


This career was made with patch 1.34 and should work with all lower patches. It requires only the base game to run and should work with any combination of expansion and stuff packs. It works in my game but if you have problems, let me know :)


Translating


Since I'm not fluent in any language other than English, the career is only written in the one language. So if you're interested in translating, download the Language Strings file and open it in Notepad.


<KEY>Gameplay/Excel/Careers/CareerList:Example</KEY>
<STR>Translate This Text</STR>


Do that for the entire file :)


Download here:
Career: http://sdrv.ms/KMs2VJ
Translate: http://sdrv.ms/MthjoQ


Credit to:
Lientebollemeis, Lizzietrots, the creators of s3pe and SimOutfitter, ShimiChibi for Polish translation