Policy

Pagina's

IMPORTANT INFORMATION

zaterdag 29 september 2012

New career: Illusionist (requested)

As I do take requests, Elyxyze requested the career Illusionist.
This is a career for adults. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC

Icon:

Screenshot:




The creation will be/was published Sep 29, 2012
And can be found here: http://bit.ly/UiEUsU

 

vrijdag 28 september 2012

New remake Sims Bustin' Out: Counter Culture

This is a remake of the known Maxis' (EA Games) career.
It's not available in The Sims 2 Base Game.

Icon:




Screenshot:













Download: 
S2I: http://sdrv.ms/VN28H5

A lot of people asked to create this and finally I remade them all.
Here's an overview of all the remade careers (+ more information on how and why I made this).
(This career is not seen in the overview as I created it later.)

I also accept requests full time!
If you have a request please go here: bit.ly/p9ymWC

Credits:
All people who requested one or several of these careers
EA Games and Maxis
SimPE
This site without I couldn't create this (all information about careers SPOILER!)
- http://bit.ly/OAqLlK
-- (I'm not responsible for changes on this site. If something is not the same as the careers I made that's because it has been changed in the meantime.)

IMPORTANT
I do NOT  take any credit for the levels, descriptions, promotional skills needed, etc. as they are just taken from the Maxis' careers. I tried my best with everything I could not supply from the Maxis career.

Please, don't upload these careers anywhere. If you want to share them, share by the button Twitter, Facebook,...
Or share this link anywhere: http://bit.ly/NcnSNW

New insiminator option explained: Aspiration adjustor


Where do I download the insiminator?
- You can download it here: Downloads
- The Insiminator is compatible with ALL expansions.
Where do I find it in game?
Elektronics ---> All

Aspiration adjustor


For this adjustor there are following options:




  • My Aspiration Score
    • Change the aspiration score.
  • Group Aspiration Score
    • Change the aspiration score of all sims.
  • Set Aspiration Score
    • Decide which level your aspiration should be.
  • Add Aspiration Points
    • Add aspiration points to buy aspiration awards.
  • Change Aspiration
    • Change the aspiration, turn ons and turn offs of your sim.
  • Randomize
    • The game chooses the aspiration for you.
  • Aspiration Score Decay
    • I don't know what this does.
  • Aspiration Score Lock
    • The aspiration score of your sim doesn't change anymore.
  • Lifetime Platinum
    • Have lifetime Platinum like forfilling the lifetime wish.
  • Lifetime Wants
    • Lifetime wish/want is changed randomly.
  • Wants Panel
    • Add a lock or slot to the wants and fear panel

woensdag 26 september 2012

New teen career: Babysitter (requested)

As I do take requests,  Superstar001 requested the career Babysitter.
This is a career for teens. It's EP compatible and has its own GUID (no overwrite).
No EP required
Click the button to see more information.
If you also have a request please go here: http://bit.ly/p9ymWC


The creation will be/was published Sep 26, 2012
And can be found here: http://bit.ly/TINsXP

 

dinsdag 25 september 2012

maandag 24 september 2012

New FAQ: More help for doing a career request

Some people let me know that they follow the instructions to the letter, but still their request is rejected.
If they really would have done everything like the instructions say you need to check, the request would have been accepted!

  • The reason why the instructions are this strict, is because I have less time to create so I don't have the time to correct any tiny mistake.
  • I also want to assure the downloaders they download a perfect finished creation.
    • Quality is really important and I want to keep up my reputation as Selected Artist (TSR) and Picked Creator (MTS)
  • I start creating the career immediatly (I just view at the request quickl) so I need to have a blind trust the request is perfect
I check following things: 
  • Spelling and grammar:
    • I read the descriptions very quickly. If I see just the one mistake, I stop looking further.
      • Punctuation
      • Do the sentences make any sense?
      • Apostrophe's
      • No abbreviations (kinda, gonna,...)
      • Capital letter
      • Form of the sentence
  • Descriptions:
    • This is mostly based on MTS's rules. They reject careers for this:
      • Growth in the career
      • Creativity (no repetition)
      • Length of description
  • Wages:
    • All wages need to be within the indicated range. If one is not, the request is rejected
  •  Skills:
    • If any of the needed skills at level ten is higher than 10, the request is rejected.
    • HINT
      • Before you start filling out the form, write on a piece of paper which and how many skillpoints are needed for every level.
        That way you can't be mistake why filling out the form.


This is all found very clearly in the instructions. Lot of requests have been accepted so there are people who do follow the instructions correctly.

The form is made in such a way it's nearly impossible to have a reason for rejection.
You need to check four main things. If these are good, the request is accepted asap:

  • Spelling and grammar
  • Creativity (length + growth)
  • Wages (a clear range is always indicated)
  • Skills (make a clear schedule for yourself beforehand)

zondag 23 september 2012

New Poll: Which days for a part-time career